| Plan Review Stops For Project E09080008 |
| Review Stop |
ENG-A |
ENGINEERING FORMAL REVIEW |
| Rev No |
1 |
Status |
P |
Date |
11-02-2009 |
|
|
Cont ID |
|
| Sent By |
mgonzale |
Date |
11-02-2009 |
Time |
14:26 |
Rev Time |
2.00 |
| Received By |
mgonzale |
Date |
11-02-2009 |
Time |
14:26 |
Sent To |
|
|
| Notes |
| 2009-11-02 14:26:46 | PASSED | | | REVIEWED AS-BUILTS | | | READY FOR WALK-THRU | | | |
|
|
| Review Stop |
ENG-F |
ENGINEERING FINAL DRAWING REV |
| Rev No |
1 |
Status |
P |
Date |
11-02-2009 |
|
|
Cont ID |
|
| Sent By |
|
Date |
11-02-2009 |
Time |
|
Rev Time |
4.00 |
| Received By |
|
Date |
11-02-2009 |
Time |
|
Sent To |
|
|
| Notes |
| 2009-11-02 14:28:27 | PASSED: | | | | | | REVIEWED SETS WITH MR TILKA AND APPROVED PFL LOCATION | | | WITH BACKFLOWS | | | MR TILKA WAS PRESENTED WITH A QUOTE AND PAID THE FEES | | | REQUIRED | | | NO EASEMENTS REQUIRED. | | | WALK THRU IS SETUP FOR 11/03/09 | | | | | | |
|
|
| Review Stop |
ENG-P |
ENGINEERING PLANNING REVIEW |
| Rev No |
1 |
Status |
P |
Date |
11-02-2009 |
|
|
Cont ID |
|
| Sent By |
|
Date |
11-02-2009 |
Time |
|
Rev Time |
2.00 |
| Received By |
|
Date |
11-02-2009 |
Time |
|
Sent To |
|
|
| Notes |
| 2009-11-02 14:29:41 | ROW PERMIT MATERIAL WAS PRESENTED | | | MOT WAS REVIEWED | | | FEES PAID. | | | | | | |
|
|
| |