Plan Review Details - Project E09080008
Plan Review Stops For Project E09080008
Review Stop ENG-A ENGINEERING FORMAL REVIEW
Rev No 1 Status P Date 11-02-2009 Cont ID  
Sent By mgonzale Date 11-02-2009 Time 14:26 Rev Time 2.00
Received By mgonzale Date 11-02-2009 Time 14:26 Sent To  
Notes
2009-11-02 14:26:46PASSED
 REVIEWED AS-BUILTS
 READY FOR WALK-THRU
  

Review Stop ENG-F ENGINEERING FINAL DRAWING REV
Rev No 1 Status P Date 11-02-2009 Cont ID  
Sent By   Date 11-02-2009 Time   Rev Time 4.00
Received By   Date 11-02-2009 Time   Sent To  
Notes
2009-11-02 14:28:27PASSED:
  
 REVIEWED SETS WITH MR TILKA AND APPROVED PFL LOCATION
 WITH BACKFLOWS
 MR TILKA WAS PRESENTED WITH A QUOTE AND PAID THE FEES
 REQUIRED
 NO EASEMENTS REQUIRED.
 WALK THRU IS SETUP FOR 11/03/09
  
  

Review Stop ENG-P ENGINEERING PLANNING REVIEW
Rev No 1 Status P Date 11-02-2009 Cont ID  
Sent By   Date 11-02-2009 Time   Rev Time 2.00
Received By   Date 11-02-2009 Time   Sent To  
Notes
2009-11-02 14:29:41ROW PERMIT MATERIAL WAS PRESENTED
 MOT WAS REVIEWED
 FEES PAID.
  
  