SOUTHWIND PLAZA - BANK OF AMERICA ATM Conversion of a drive-through teller lane to a drive-through ATM lane at the Bank of America. Approval is granted with the following conditi ons: 1. Provide with building permit submittal a revised photometric plan d emonstrating that the illumination level will not exceed 1 footcandle at the boundary of the Commercial Planned Development (CPD). 2. All missing, damaged or unhealthy shrubs shall be replaced in the r emaining landscape planters for all drive through lanes. Mulch shall b e installed per code.