SPRINT - MI60XC276 - CROWN AAEE. The scope of the work includes the following: 1. Removal of three (3) existing equipment cabinets; 2. Installation of two (2) new equipment cabinets; 3. Removal of three (3) existing antennas; 4. Installation of three (3) new antennas; and 5. Removal an installation of one (1) GPS antenna.