| Date |
Text |
| 2001-01-08 00:00:00 | NO CHANGE: |
| | PER E-MAIL DATED 3-07-200 FROM SONJA |
| | KNIGHTON, ASSISTANT CITY ATTORNEY TO |
| | DEAN LAUDERMILK (THIS PLAN REVIEWER) |
| | "PLEASE HOLD THE BOUTIQUE HOTEL PLANS |
| | UNTIL WE RECEIVE FINAL VERSION OF THE |
| | EASEMENTS."THE FINAL VERSION OF THE |
| | EASEMENT PAPERWORK IS INCOMPLETE. |
| | |
| | NO CHANGE: |
| | SHEET P-400, GREASE TRAP DETAIL DOES NOT |
| | MATCH CITY STANDARD.USE OUR STANDARD |
| | DETAIL, MINIMUM.AS SHOWN THE GREASE |
| | WILL FLOW RIGHT THRU THE BOX AS DRAWN. |
| | ADDITIONALLY THIS DRAWING WAS NOT |
| | SUPPLIED IN THE CIVIL DRAWINGS. |
| | |
| | NO CHANGE: |
| | SHEET P-500, SHOWS A 3" WATER METER. |
| | THE CITY STANDARD FOR 3" METERS IS 4" |
| | PIPE TO THE END OF THE CITY SERVICE, THE |
| | CONTRACTOR WILL NEED TO INSTALL A 3 X 4" |
| | INCREASER IN THE LINE WHEN LEAVING THE |
| | BUILDING.SEE THE DETAIL ON SHEET C-4 |
| | OF THE CIVIL DRAWINGS. |
| | |
| | NO CHANGE: |
| | THE UTILITY DEPARTMENT NEEDS A COPY OF |
| | THE FLOW REQUIREMENTS FOR THE METER TO |
| | BE USED.THE FLOW REQUIRED CAN NOT |
| | EXCEED THE AMOUNT THE METER CAN SUPPLY. |
| | PLEASE SUBMIT THE PUMP DESIGN CURVE AND |
| | THE FLOWS THAT CAN BE "PULLED" THROUGH |
| | THE METER ALSO. THIS WILL DETERMINE THE |
| | METER SIZE. |
| | |
| | NO CHANGE: |
| | SHEET C-1 SHOWS THE METER AND BACKFLOW |
| | ON THE NORTH SIDE OF THE DUMPSTER |
| | ENCLOSURE AND THE 6" FIRE LINE ON THE |
| | SOUTH SIDE OF THE ENCLOSURE, BUT SHEET |
| | A2.1 AND P-100 SHOWS THE DOMESTIC TIE-IN |
| | POINT ON THE SOUTH SIDE OF THE |
| | ENCLOSURE. |
| | |
| | ADDITIONAL COMMENT: |
| | NEW ADAIR AND BRADY PLANS STAMPED |
| | APPROVED BY OUR OFFICE ON 7-25-2000 NEED |
| | TO BE SUBMITTED THIS SUBMITTAL HAS THE |
| | OLD PLAN.THE NEW PLAN ADDRESSES ALL OF |
| | OUR CONCERNS. |
| | |
| | NO CHANGE: |
| | SHEET P-100 SHOWS THE TIE-IN TO THE |
| | SANITARY OUT THE DUMPSTER ENCLOSURE. IT |
| | NEEDS TO BE CHANGED TO THE SOUTHEAST |
| | CORNER OF THE BUILDING, THE WAY IT SHOWS |
| | ON THE NEW ADAIR AND BRADY PLAN. |
| | |
| | NO CHANGE: |
| | TO OBTAIN A CONSTRUCTION PERMIT THE |
| | FOLLOWING MUST BE SUBMITTED SIGNED AND |
| | SEALED BY A FLORIDA PROFESSIONAL |
| | ENGINEER (PE): |
| | |
| | NO CHANGE: |
| | NEED IMPERVIOUS AREA COMPUTATIONS. |
| | |
| | NO CHANGE: |
| | POLLUTION PREVENTION PLAN.THE |
| | POLLUTION PREVENTION PLAN SHALL BE KEPT |
| | ON SITE AT ALL TIMES DURING |
| | CONSTRUCTION. THE PLAN SHALL BE |
| | INSTALLED IN THE FIELD PRIOR TO ANY |
| | EARTHWORK. THE ENGINEER OF RECORD SHALL |
| | CERTIFY TO THE CITY, ON A MONTHLY BASIS, |
| | THAT THE PLAN IS WORKING PROPERLY AND AS |
| | DESIGNED. THE ENGINEER OF RECORD IS |
| | RESPONSIBLE TO CERTIFY IMPLEMENTATION OF |
| | THE PROVISIONS OF CITY ORDINANCE NO. |
| | 3132-98 OF THE CITY CODE AT SUCH TIME |
| | THE PERMITTEE APPLIES FOR A CERTIFICATE |
| | OF OCCUPANCY FROM THE CITY BUILDING |
| | OFFICIAL. |
| | |
| | NO LANDSCAPE PLAN WITH LATEST SUBMITTAL. |