| Date |
Text |
| 2002-07-18 00:00:00 | 1) PLEASE SUBMIT A COMPREHENSIVE |
| | NARRATIVE FOR THE SMOKE CONTROL SYSTEM |
| | PLANNED FOR USE. THE ORIGINAL DESIGN |
| | INDICATED PRESSURIZING TWO FLOORS ABOVE |
| | AND TWO FLOORS BELOW WITH THE FLOOR |
| | OF INCIDENT BETWEEN THESE. DURING |
| | TESTING WITH CITY MECHANICAL DIVISION |
| | PERSONNEL, PROBLEMS WERE IDENTIFIED |
| | AND THUS THE ORGINAL DESIGN HAS SINCE |
| | BEEN CHANGES. THE NARRATIVE IS |
| | REQUIRED FROM THE ENGINEER OF RECORD |
| | TO PROVIDE SUPPORTIVE DOCUMENTATION |
| | FOR THE DESIGN CHANGE. |
| | |
| | 2) IS IS UNDERSTOOD BY THIS OFFICE THAT |
| | A TEMPROARY SHROUD HAS BEEN INSTALLED |
| | ON THE FAN. THIS TEMPORARY DEVICE IS |
| | TO BE REMOVED AS IT NOT PART OF THE |
| | ORIGINAL LISTING FOR THE FAN DEVICE. |
| | |
| | 3) THE ACCEPTANCE TESTING CRITERIA |
| | NOTED ON THE PLANS ARE TO BE FOLLOWED. |
| | |
| | 4) THE OWNER, ENGINEER, AND CONTRACTOR |
| | MUST ACCEPT THE LIABILTIY FOR |
| | THE PRESCRIBED SYSTEM DURING TESTING |
| | SINCE THE DESIGN INTENT HAS CHANGED |
| | SIGNIFICANTLY. THE ENGINEER OF RECORD |
| | SHALL BE CONSULTED DURING THE ENTIRE |
| | TESTING PROCESS. |
| | |
| | 5) THE FUNCTIONAL APPROVAL BY CITY |
| | OFFICIALS WILL ONLY OCCUR AFTER |
| | MUTUALLY AGREED UPON TESTING METHODS |
| | AND RESULTS ARE DISCUSSSED. |
| | |
| | 6) ALL APPLICABLE BUILDING, FIRE , AND |
| | MECHANICAL CODES ARE TO BE MET FOR |
| | THE SYSTEM WITHIN THE BUILDING. |