| 2001-01-08 00:00:00 | PASSED WITH THE FOLLOWING PROVISOS: |
| | 1.PARKING LOT CAN NOT BE BUILT UNTIL |
| | THE UNDERGROUND UTILITY PLAN IS APPROVED |
| | FOR WATER, SANITARY AND STORM WATER. |
| | |
| | 2.NO STORMWATER PLAN HAS BEEN APPROVED |
| | AND ALL OF THE FOLLOWING ITEMS NEED TO |
| | BE ADDRESSED; |
| | |
| | A. CONSTRUCTION PLANS |
| | |
| | B. DETAILS AND SPECIFICATIONS |
| | |
| | C. HYDRAULIC COMPUTATIONS AND SUPPORTING |
| | DOCUMENTATION |
| | |
| | D. IMPERVIOUS AREA COMPUTATIONS |
| | |
| | E. POLLUTION PREVENTION PLAN.THE |
| | POLLUTION PREVENTION PLAN SHALL BE KEPT |
| | ON SITE AT ALL TIMES DURING |
| | CONSTRUCTION. THE PLAN SHALL BE |
| | INSTALLED IN THE FIELD PRIOR TO ANY |
| | EARTHWORK. THE ENGINEER OF RECORD SHALL |
| | CERTIFY TO THE CITY, ON A MONTHLY BASIS, |
| | THAT THE PLAN IS WORKING PROPERLY AND AS |
| | DESIGNED. THE ENGINEER OF RECORD IS |
| | RESPONSIBLE TO CERTIFY IMPLEMENTATION OF |
| | THE PROVISIONS OF CITY ORDINANCE NO. |
| | 3132-98 OF THE CITY CODE AT SUCH TIME |
| | THE PERMITTEE APPLIES FOR A CERTIFICATE |
| | OF OCCUPANCY FROM THE CITY BUILDING |
| | OFFICIAL |
| | |
| | F. EVERY SIX MONTHS AFTER CONSTRUCTION A |
| | PE SHALL CERTIFY THAT THE PERMANENT |
| | POLLUTION PREVENTION STRUCTURES, DRY-WET |
| | WATER DETENTION FACILITIES, AND |
| | EXFILTRATION SYSTEMS ARE WORKING AS |
| | DESIGNED AND ARE IN GOOD OPERATING |
| | CONDITION. ALL CERTIFICATIONS MUST BE |
| | SUBMITTED TO: |
| | STORM WATER UTILITY ENGINEER |
| | CITY OF WEST PALM BEACH PUBLIC UTILITIES |
| | DEPARTMENT |
| | P.O. BOX 3366, WEST PALM BEACH, FL |
| | 33402. |
| | |
| | THE CERTIFICATION MUST INCLUDE THE |
| | BUILDING PERMIT NUMBER, THE ADDRESS OF |
| | THE PROPERTY AND THE NAME OF THE |
| | ESTABLISHMENT/PROJECT CONSTRUCTED. |
| | |
| | 3. SHEETS A-1, A-1.1, P2.1 AND SHEET 1 |
| | OF 2 OF THE FIRE SPRINKLER PLAN SHOW THE |
| | BACKFLOW LOCATION FOR THE FIRE SPRINKLER |
| | SYSTEM AT THE BUILDING (SOUTHWEST |
| | CORNER).THIS IS INCORRECT, IT WILL BE |
| | PLACED AT THE WEST PROPERTY LINE AS |
| | SHOWN ON THE UNDERGROUND UTILITY PLAN |
| | SUPPLIED BY SIMMONS AND WHITE (SEE |
| | ATTACHED). |
| | |
| | 4.DETAIL FOR THE DCDA ON THE FIRE |
| | SPRINKLER DRAWING (1 OF 2) DOES NOT SHOW |
| | AN ELEVATION ABOVE THE FLOOD PLAIN OR |
| | GROUND ELEVATION.IT MUST BE PER THE |
| | CITY DETAIL SHOWN ON THE UNDERGROUND |
| | PLAN BY SIMMONS AND WHITE. |
| | |
| | 5.ON SHEET P2.2 THE SANITARY SEWER |
| | PIPING EXITS THE NORTH SIDE OF THE |
| | BUILDING NEAR "K4".WHILE THE |
| | UNDERGROUND PLAN BY SIMMONS AND WHITE |
| | SHOWS THE LATERAL ENTERING THE BUILDING |
| | ON THE EAST SIDE NEAR "H5".YOU NEED TO |
| | COORDINATE THIS DESIGN AND WORK SINCE IT |
| | WILL BE INSTALLED PER THE SIMMONS AND |
| | WHITE PLAN. |
| | |
| | 6.ON SHEET P2.2 AN 1-1/2" METER IS |
| | SHOWN TO BE PLACED AT THE NORTHEAST |
| | CORNER OF THE BUILDING WITH THE 2" PIPE |
| | ENTERING THE BUILDING AT "K5".ON THE |
| | UNDERGROUND PLAN BY SIMMONS AND WHITE |
| | (SEE ATTACHED) SHOW THE WATER METER AT |
| | THE SOUTHWEST CORNER OF THE PROPERTY |
| | WITH THE WATER LINE ENTERING THE |
| | BUILDING AT "A3.1" ON SHEET P2.1.YOU |
| | NEED TO COORDINATE THIS DESIGN AND WORK |
| | SINCE IT WILL BE INSTALLED PER THE |
| | SIMMONS AND WHITE PLAN. |