| Date |
Text |
| 2001-01-08 00:00:00 | |
| | ****************DENIED****************** |
| | SBC 104.2.2 |
| | 1)PROVIDE 2 CURRENT COPIES OF SURVEY. |
| | |
| | 2)PROVIDE OWNER SIGNATURE ON ENERGY |
| | CALCULATIONS. |
| | |
| | 3)PROVIDE MISSILE IMPACT PROTECTION |
| | INFORMATION. |
| | |
| | 4)PROVIDE 2 CURRENT COPIES OF PRODUCT |
| | APPROVALS FOR: |
| | ROOF COVERING |
| | EXTERIOR DOORS |
| | |
| | 5)PROVIDE WALL SECTIONS THAT MATCH. |
| | |
| | 6)PROVIDE ACCESS TO BEDROOM 3. |
| | |
| | 7)PROVIDE ROOF FRAMING PLAN WITH UPLIFT |
| | CALCULATIONS AND ANCHOR SCHEDULE. |
| | |
| | 8)PROVIDE WINDOW AND DOOR BUCK DETAILS |
| | WITH CONNECTIONS FOR WINDLOAD SBC 1606 |
| | |
| | 9)PROVIDE WINDOWS THAT COMPLY WITH |
| | EGRESS REQUIREMENTS. |
| | |
| | 10)PROVIDE DESIGN PRESSURE CALCULATIONS |
| | FOR ALL EXTERIOR DOOR AND WINDOW |
| | OPENINGS. |
| | |
| | 11)PROVIDE SEAL AND SIGNATURE OF |
| | ENGINEER ON PLANS THAT SUBMITTED DESIGN |
| | CERTIFICATION FOR BUILDING CODE |
| | COMPLIANCE. |
| | |
| | 12)PROVIDE QUALIFIED SOIL TECHNICIAN |
| | TO MONITOR SITE PREPERATION AND |
| | EARTHWORK PER SOIL REPORT. |
| | |
| | 13)PROVIDE ELEVATIONS THAT MATCH LAYOUT |
| | THAT IS SHOWN ON FLOOR PLAN. |
| | |
| | ****************NOTE******************** |
| | |
| | BEFORE A PERMIT TO CONSTRUCT CAN BE |
| | ISSUED,IMPACT FEES MUST BE PAID TO PALM |
| | BEACH CO.,THE PLANS STAMPED BY THEM AND |
| | THE RECIEPT ATTACHED TO THE PERMIT |
| | APPLICATION. |