| Date |
Text |
| 2001-01-08 00:00:00 | CHECKLIST: |
| | 1-PAY IMPACT FEES TO PALM BEACH COUNTY. |
| | BRING STAMPED DRAWINGS AND RECEIPT. |
| | 2-EGRESS OPENING FROM "ATRIUM" AREA TO |
| | HAVE 5 SQUARE FEET OF CLEAR OPENING |
| | MINIMUM. SEC 1005.4.4 SBC 1997. |
| | -TOP OF PRIVACY WALL AT "ATRIUM" TO BE |
| | UP TO THE BOTTOM OF LINTEL OF SLIDING |
| | GLASS DOOR. REVISE HEIGHT AS REQUIRED. |
| | 3-PROVIDE COMPLETE DETAILS FOR |
| | INSTALLATION OF AHU HUNG FROM TRUSSES. |
| | SPECIFY ALL CONNECTORS. |
| | 4-ENERGY CALCULATIONS TAKE CREDIT FOR |
| | CEILING FANS. SPECIFY SIZES OF FANS AS |
| | PER TABLE 6-6 OF FLORIDA ENERGY CODE |
| | 1997 EDITION. |
| | 5-REVISE WIND LOAD CERTIFICATION FORM |
| | AS REQUIRED. |
| | 6-ENERGY CALCULATIONS TO BE SITE |
| | SPECIFIC. FILL IN ALL INFORMATION ON |
| | TOP PORTION OF FORM 600A-97 AND |
| | OWNER/AGENT TO SIGN AND DATE FORM AS |
| | WELL. |
| | -NOTE: THE CLIMATE ZONE IS #8 NOT |
| | SOUTH. SOUTH IS THE REGION. REVISE AS |
| | REQUIRED. |
| | 7-PROVIDE PRODUCT APPROVAL FOR ROOF TILE |
| | AND CLEARLY SPECIFY FASTENING METHOD. |
| | -SEE COMMENTS ON FRONT PAGE OF ALL |
| | PRODUCT APPROVALS SUBMITTED AND |
| | HIGHLIGHT THE COMPONENTS AS REQUIRED. |
| | 8-SEE COMMENTS ON ARCHITECTURAL PLANS |
| | AND REVISE/UPDATE DRAWINGS AS REQUIRED |
| | 9-PROVIDE SOIL TEST REPORT. |
| | 10-OWES $470.05 TO THE CITY OF WEST PALM |
| | BEACH FOR LOW VALUATION AND RADON FEES |
| | 11-STORM PANELS: |
| | -PROVIDE A COMPLETE INSTALLATION |
| | SCHEDULE (AS PER CITY SAMPLE) AND KEY |
| | PLAN. |
| | -HIGHLIGHT SPECIFIC MOUNTING CONDITIONS |
| | USED IN THIS PROJECT. |
| | -HIGHLIGHT SPECIFIC ANCHORS TO BE USED |
| | ACCORDING TO THE DESIGN PRESSURES, |
| | PANEL SPAN, BUILDING CONSTRUCTION ETC. |
| | NOTE: THIS BUILDING IS MASONRY |
| | CONSTRUCTION. USE ANCHORS AS REQUIRED. |