| 2001-01-08 00:00:00 | D. CONTINUED: |
| | A BLANK ROW PERMIT HAS |
| | BEEN ATTACHED FOR YOUR USE. |
| | 3.FOR CLARIFICATION, THE NEW SANITARY |
| | MAIN IN PALM BEACH LAKES BOULEVARD, FROM |
| | THE EXISTING MANHOLE TO MANHOLE #11 |
| | BELONGS TO THE CITY.FROM THERE ONTO |
| | THE SITE IT IS PRIVATE. |
| | 4.ON HANK AARON DRIVE ALL OF THE |
| | SANITARY MAIN BELONGS TO THE CITY. |
| | 5.THE IRRIGATION PLANS ARE NOT |
| | APPROVED FOR THE FOLLOWING REASONS: |
| | 5A. YOU DO NOT HAVE PERMISSION TO PLACE |
| | IRRIGATION PUMP ON CITY PROPERTY (CANAL |
| | ROW) AND PUMP OUT OF OUR DRINKING WATER |
| | SUPPLY (LAKE). |
| | 5B.SEE COMMENT B2. |
| | 6.THE PLANS WERE NOT LOOKED AT FOR |
| | SIGNAGE, STRIPPING OR CONSTRUCTION ON |
| | THE PARKING LOTS. |
| | THE FOLLOWING ARE COMMENTS THAT RICHARD |
| | PITTMAN HAS MADE: |
| | THERMOPLASTIC PAVEMENT MARKINGS SHALL BE |
| | PLACED IN THE PUBLIC ROAD RIGHT-OF-WAYS. |
| | WHO OWNS AND MAINTAINS IRRIGATION PUMP |
| | NO. 3? |
| | DEVELOPER TO COORDINATE AND PAY FOR |
| | TRAFFIC SIGNAL ADJUSTMENTS. |
| | RAMPS FOR THE H/C REQUIRED AT |
| | INTERSECTIONS. |
| | STREET LIGHTS ARE NOT APPROVED AS THE |
| | PLAN SET DOES NOT INCLUDE THE PLANS AND |
| | DETAILS. |
| | THERE ARE TIMES WHEN THE GROUND WATER |
| | TABLE WILL BE CLOSE TO ELEVATION 14.5. |
| | THE TRUCK WELL WILL EXPERIENCE WATER AND |
| | THE SUMP PUMP SHOULD BE HEAVY DUTY. |
| | THE PUBLIC ROADWAYS SHALL BE CONSTRUCTED |
| | FROM EITHER 6" THICK ASPHALT BASE COURSE |
| | TYPE III OR 8" THICK LIME ROCK.THE USE |
| | OF COQUINA ROCK IS NOT APPROVED. |
| | ALL 4-WAY AND 3-WAY STOP INTERSECTION |
| | SHALL BE SIGNED 4-WAY OR 3-WAY. |
| | TYPE "F" CURB AND GUTTER SHALL BE USED |
| | ON HANK AARON DRIVE WHERE THERE ARE LONG |
| | STRETCHES WITHOUT PARKING ON THE SIDE. |
| | SEE SHEET IT HAS FIVE. |
| | EXPANSION AND CONTRACTION JOINTS IN CURB |
| | AND SIDEWALK SHALL BE INSTALLED PER FDOT |
| | REQUIREMENTS. |
| | PAGE R-I - SPELLING OF ASPHALTIC. |
| | THERE IS A DISCREPANCY ON PLANS |
| | REGARDING IRRIGATION PUMP STATION NO. 3. |
| | THE SOUTH TERMINUS OF HANK AARON DRIVE |
| | (STATION 30+10) SHOULD BE SIGNED 3 OR 4- |