2001-01-08 00:00:00PASSED WITH PROVISOS:
 1. PHASE II OF THE ROAD IS NOT APPROVED
 FOR CONSTRUCTION.SINCE THE WATER,
 SANITARY AND ROAD HAS NOT BEEN APPROVED
 THEY CAN NOT BE BUILT. SEE PAGE HA1,THRU
 HA7, HA-L1, AND HA-IR1 SERIES:
 2. THE PUBLIC ROADWAYS SHALL BE
 CONSTRUCTED FROM EITHER 6" THICK ASPHALT
 BASE COURSE TYPE III OR 8" THICK LIME
 ROCK.THE USE OF COQUINA ROCK IS NOT
 APPROVED.
 3. ALL 4-WAY AND 3-WAY STOP INTERSECTION
 SHALL BE SIGNED 4-WAY OR 3-WAY.
 4. TYPE "F" CURB AND GUTTER SHALL BE
 USED ON HANK AARON DRIVE WHERE THERE ARE
 LONG STRETCHES WITHOUT PARKING ON THE
 SIDE.
 5. EXPANSION AND CONTRACTION JOINTS IN
 CURB AND SIDEWALK SHALL BE INSTALLED PER
 FDOT REQUIREMENTS.
 6.STREET LIGHTS PLANS HAVE NOT BEEN
 FINALIZED AND ARE NOT PART OF THIS
 REVIEW.SUBMIT THEM FOR PLAN REVIEW
 WITH NUMBER 1.
 7. THE IRRIGATION SYSTEM AND LANDSCAPING
 WILL BE PRIVATELY MAINTAINED IN THE
 ROAD ROW.
 8. THE PRODUCT LIST ON PAGE C-11 IS NOT
 BELONGS TO THE CITY.FROM THERE ONTO
 APPROVED.SUBMIT SHOP DRAWINGS AT THESP
 TIME OF CONSTRUCTION.UTILITIES WILL
 ONLY APPROVE CITY OWNED MATERIALS.O THE
 9. HOME DEPOT SITE PLAN:NT MARKINGS SHAL
 A. WENDY'S, THE FUTURE FAST FOODPAY FOR
 RESTAURANT SOUTH OF WENDY'S (BOTH WEST
 SIDE OF HANK AARON) ARE NOT PART OF THIS
 REVIEW EXCEPT FOR THE STORMWATER LINE.
 B.BESIDES THE STORMWATER LINE ON THE
 HOME DEPOT ONLY THE STORMWATER LINES TO
 THE OTHER OUT PARCELS ARE APPROVED.ALL
 OUT PARCELS MUST BE PART OF SEPARATED
 PERMITS, SUCH AS MOBIL'S "ON THE RUN"
 STORE.ILDING PERMIT.
 10. A BLANK ROW PERMIT HAS BEEN ATTACHED
 FOR YOUR USE..
 11.FOR CLARIFICATION, THE NEW SANITARY
 MAIN IN PALM BEACH LAKES BOULEVARD, FROM
 THE EXISTING MANHOLE TO MANHOLE #11ROM
 BELONGS TO THE CITY.FROM THERE ONTOED
 THE SITE IT IS PRIVATE AND SHALL BE
 INSPECTED BY B&Z.FLOW PREVENTER OFF OF
 12.ON HANK AARON DRIVE ALL OF THEOWNED
 SANITARY AND WATER MAINS BELONGS TO THE
 CITY.NSTALL DOUBLE VALVING AND A PIG
 13. THERMOPLASTIC PAVEMENT MARKINGSHE
 SHALL BE PLACED IN THE PUBLIC ROAD
 RIGHT-OF-WAYS.HE SANITARY RUN FROM PHASE
 14. DEVELOPER TO COORDINATE AND PAY FOR
 TRAFFIC SIGNAL ADJUSTMENTS.HE MANHOLE
 15.RAMPS FOR THE H/C REQUIRED AT OUT
 INTERSECTIONS.