Notes
Date Text
2001-01-08 00:00:00FAILED.
 IF THE CONTRACTOR WANTS TO START WORK HE
 CAN GET A BUILDING PERMIT ONLY, THAT
 WOULD NOT COVER ANY OF THE SITE WORK.
 IF HE WANTS A BUILDING PERMIT THEN
 SUBMIT ALL SITE WORK SHEETS SEPARATELY
 AND APPLY FOR A SITE WORK PERMIT AND
 THEY WILL GIVE YOU A BUILDING ONLY
 PERMIT.
  
 WATER AND SANITARY COMMENTS:
 1. A DCDA WILL NEED TO BE INSTALLED AT
 THE PROPERTY LINE ON THE FIRE LINE, IT
 IS NOT A CITY WATER MAIN EXTENSION BUT
 WILL BE CONSIDERED A PRIVATE FIRE LINE.
  
 2. WATER AND SANITARY PLANS SHOULD BE
 SUBMITTED TO B&Z FOR THE BUILDING PERMIT
 THAT ARE ALREADY STAMPED APPROVED BY THE
 PUBLIC UTILITIES DEPARTMENT.
  
 3. A WATER AND SANITARY DEP PERMIT IS
 REQUIRED FOR THIS JOB, UNLESS WE RECEIVE
 A LETTER FROM THE HEALTH DEPARTMENT
 SAYING THAT A PERMIT IS NOT REQUIRED.
  
 STORM WATER REQUIREMENTS:
 TO OBTAIN A CONSTRUCTION PERMIT THE
 FOLLOWING MUST BE SUBMITTED SIGNED AND
 SEALED BY A FLORIDA PROFESSIONAL
 ENGINEER (PE).
  
 1.CONSTRUCTION PLANS.
  
 2.DETAILS AND SPECIFICATIONS.
  
 3.HYDRAULIC COMPUTATIONS AND SUPPORTING
 DOCUMENTATION.
  
 4.IMPERVIOUS AREA COMPUTATIONS.
  
 5.POLLUTION PREVENTION PLAN.THE
 POLLUTION PREVENTION PLAN SHALL BE KEPT
 ON SITE AT ALL TIMES DURING
 CONSTRUCTION. THE PLAN SHALL BE
 INSTALLED IN THE FIELD PRIOR TO ANY
 EARTHWORK. THE ENGINEER OF RECORD SHALL
 CERTIFY TO THE CITY, ON A MONTHLY BASIS,
 THAT THE PLAN IS WORKING PROPERLY AND AS
 DESIGNED. THE ENGINEER OF RECORD IS
 RESPONSIBLE TO CERTIFY IMPLEMENTATION OF
 THE PROVISIONS OF CITY ORDINANCE NO.
 3132-98 OF THE CITY CODE AT SUCH TIME
 THE PERMITTEE APPLIES FOR A CERTIFICATE.
  
 OF OCCUPANCY FROM THE CITY BUILDING
 OFFICIAL.
  
 6.EVERY SIX MONTHS AFTER CONSTRUCTION A
 PE SHALL CERTIFY THAT THE PERMANENT
 POLLUTION PREVENTION STRUCTURES, DRY-WET
 WATER DETENTION FACILITIES, AND
 EXFILTRATION SYSTEMS ARE WORKING AS
 DESIGNED AND ARE IN GOOD OPERATING
 CONDITION.
  
 ALL CERTIFICATIONS MUST BE SUBMITTED TO:
 STORM WATER UTILITY ENGINEER
 CITY OF WEST PALM BEACH PUBLIC UTILITIES
 DEPARTMENT
 P.O. BOX 3366, WEST PALM BEACH, FL
 33402.
  
 THE CERTIFICATION MUST INCLUDE THE
 BUILDING PERMIT NUMBER, THE ADDRESS OF
 THE PROPERTY AND THE NAME OF THE
 ESTABLISHMENT/PROJECT CONSTRUCTED.