| Date |
Text |
| 2001-01-08 00:00:00 | FAILED. |
| | IF THE CONTRACTOR WANTS TO START WORK HE |
| | CAN GET A BUILDING PERMIT ONLY, THAT |
| | WOULD NOT COVER ANY OF THE SITE WORK. |
| | IF HE WANTS A BUILDING PERMIT THEN |
| | SUBMIT ALL SITE WORK SHEETS SEPARATELY |
| | AND APPLY FOR A SITE WORK PERMIT AND |
| | THEY WILL GIVE YOU A BUILDING ONLY |
| | PERMIT. |
| | |
| | WATER AND SANITARY COMMENTS: |
| | 1. A DCDA WILL NEED TO BE INSTALLED AT |
| | THE PROPERTY LINE ON THE FIRE LINE, IT |
| | IS NOT A CITY WATER MAIN EXTENSION BUT |
| | WILL BE CONSIDERED A PRIVATE FIRE LINE. |
| | |
| | 2. WATER AND SANITARY PLANS SHOULD BE |
| | SUBMITTED TO B&Z FOR THE BUILDING PERMIT |
| | THAT ARE ALREADY STAMPED APPROVED BY THE |
| | PUBLIC UTILITIES DEPARTMENT. |
| | |
| | 3. A WATER AND SANITARY DEP PERMIT IS |
| | REQUIRED FOR THIS JOB, UNLESS WE RECEIVE |
| | A LETTER FROM THE HEALTH DEPARTMENT |
| | SAYING THAT A PERMIT IS NOT REQUIRED. |
| | |
| | STORM WATER REQUIREMENTS: |
| | TO OBTAIN A CONSTRUCTION PERMIT THE |
| | FOLLOWING MUST BE SUBMITTED SIGNED AND |
| | SEALED BY A FLORIDA PROFESSIONAL |
| | ENGINEER (PE). |
| | |
| | 1.CONSTRUCTION PLANS. |
| | |
| | 2.DETAILS AND SPECIFICATIONS. |
| | |
| | 3.HYDRAULIC COMPUTATIONS AND SUPPORTING |
| | DOCUMENTATION. |
| | |
| | 4.IMPERVIOUS AREA COMPUTATIONS. |
| | |
| | 5.POLLUTION PREVENTION PLAN.THE |
| | POLLUTION PREVENTION PLAN SHALL BE KEPT |
| | ON SITE AT ALL TIMES DURING |
| | CONSTRUCTION. THE PLAN SHALL BE |
| | INSTALLED IN THE FIELD PRIOR TO ANY |
| | EARTHWORK. THE ENGINEER OF RECORD SHALL |
| | CERTIFY TO THE CITY, ON A MONTHLY BASIS, |
| | THAT THE PLAN IS WORKING PROPERLY AND AS |
| | DESIGNED. THE ENGINEER OF RECORD IS |
| | RESPONSIBLE TO CERTIFY IMPLEMENTATION OF |
| | THE PROVISIONS OF CITY ORDINANCE NO. |
| | 3132-98 OF THE CITY CODE AT SUCH TIME |
| | THE PERMITTEE APPLIES FOR A CERTIFICATE. |
| | |
| | OF OCCUPANCY FROM THE CITY BUILDING |
| | OFFICIAL. |
| | |
| | 6.EVERY SIX MONTHS AFTER CONSTRUCTION A |
| | PE SHALL CERTIFY THAT THE PERMANENT |
| | POLLUTION PREVENTION STRUCTURES, DRY-WET |
| | WATER DETENTION FACILITIES, AND |
| | EXFILTRATION SYSTEMS ARE WORKING AS |
| | DESIGNED AND ARE IN GOOD OPERATING |
| | CONDITION. |
| | |
| | ALL CERTIFICATIONS MUST BE SUBMITTED TO: |
| | STORM WATER UTILITY ENGINEER |
| | CITY OF WEST PALM BEACH PUBLIC UTILITIES |
| | DEPARTMENT |
| | P.O. BOX 3366, WEST PALM BEACH, FL |
| | 33402. |
| | |
| | THE CERTIFICATION MUST INCLUDE THE |
| | BUILDING PERMIT NUMBER, THE ADDRESS OF |
| | THE PROPERTY AND THE NAME OF THE |
| | ESTABLISHMENT/PROJECT CONSTRUCTED. |