| 2001-01-08 00:00:00 | *************PROVISO******************** |
| | |
| | 1)NOTE:AS PER 215-5 IF THERE ARE GOING |
| | TO BE TWO DISCONNECTS? THEN YOU NEED |
| | TO HAVE THEM BOTH DRAWN ON PLANS. |
| | |
| | 2)NOTE:AS PER ART;210-52D/215-5 PLEASE |
| | HAVE DEDICATED BATH(S) CIRCUT(S) SHOWN |
| | ON PANEL SCHED. NEEDS TO BE 20AMP #12 |
| | AWG. |
| | |
| | 3)NOTE:AS PER 250-81/215-5 NEED TO SHOW |
| | BLDG.STEEL AS PART OF THE GROUNDING |
| | ELECTRODE SYSTEM. |
| | |
| | 4)NOTE;NEED TO SUBMIT AIC RATING OF |
| | EQUIPMENT MAINS/PANELS AS PER THE FOLLOW |
| | -ING NEC ARTS:110-9/230-65/215-5 |
| | AIC RATING IS FIGURED FROM FAULT CURRENT |
| | CALCULATIONS. |
| | |
| | 5)NOTE: AS NOTED BEFORE!! AS PER ART: |
| | 373-8 PANELS/DISCONNECTS ETC ARE NOT TO |
| | BE USED AS RACEWAYS!!!!!!!!!!!!! THERE |
| | MUST BE AN ADDITIONAL CONDUIT FROM METER |
| | GOING TO SECOND DISC.!!!!! |
| | EACH COONDUIT MUST ONLY CONTAIN ONE SET |
| | OF CONDUCTORS. |
| | |
| | **************************************** |
| | ALL THE ABOVE INFORMATION NEEDS TO BE |
| | SUBMITTED FOR REVIEW AND APPROVAL |
| | BEFORE THE FIRST ROUGH ELECTRICAL |
| | INSPECTION IS CALLED IN!!!!! IF THERE |
| | ARE ANY QUESTIONS,,,CALL 659-8096 EXT. |
| | 8372 |