| 2001-01-08 00:00:00 | FAILED.NEED THE FOLLOWING INFORMATION |
| | SUPPLIED: |
| | NEED UNITY OF TITLE FOR PROPERTY TO THE |
| | NORTH (LOTS 1 & 2) WITH THIS PROPERTY. |
| | OWNER WANTS TO CROSS IT FOR WATER AND |
| | SANITARY HOOK-UPS. |
| | STORM WATER REQUIREMENTS: |
| | TO OBTAIN A CONSTRUCTION PERMIT THE |
| | FOLLOWING MUST BE SUBMITTED SIGNED AND |
| | SEALED BY A FLORIDA PROFESSIONAL |
| | ENGINEER (PE). |
| | 1. CONSTRUCTION PLANS |
| | 2. DETAILS AND SPECIFICATIONS |
| | 3. HYDRAULIC COMPUTATIONS AND SUPPORTING |
| | DOCUMENTATION |
| | 4.IMPERVIOUS AREA COMPUTATIONS |
| | 5.POLLUTION PREVENTION PLAN.THE |
| | POLLUTION PREVENTION PLAN SHALL BE KEPT |
| | ON SITE AT ALL TIMES DURING |
| | CONSTRUCTION. THE PLAN SHALL BE |
| | INSTALLED IN THE FIELD PRIOR TO ANY |
| | EARTHWORK. THE ENGINEER OF RECORD SHALL |
| | CERTIFY TO THE CITY, ON A MONTHLY BASIS, |
| | THAT THE PLAN IS WORKING PROPERLY AND AS |
| | DESIGNED. THE ENGINEER OF RECORD IS |
| | RESPONSIBLE TO CERTIFY IMPLEMENTATION |
| | OF THE PROVISIONS OF CITY ORDINANCE NO. |
| | 3132-98 OF THE CITY CODE AT SUCH TIME |
| | THE PERMITTEE APPLIES FOR A CERTIFICATE |
| | OF OCCUPANCY FROM THE CITY BUILDING |
| | OFFICIAL. |
| | 6.EVERY SIX MONTHS AFTER CONSTRUCTION A |
| | PE SHALL CERTIFY THAT THE PERMANENT |
| | POLLUTION PREVENTION STRUCTURES, DRY-WET |
| | WATER DETENTION FACILITIES, AND |
| | EXFILTRATION SYSTEMS ARE WORKING AS |
| | DESIGNED AND ARE IN GOOD OPERATING |
| | CONDITION. ALL CERTIFICATIONS MUST BE |
| | SUBMITTED TO: |
| | STORM WATER UTILITY ENGINEER |
| | CITY OF WEST PALM BEACH PUBLIC UTILITIES |
| | DEPARTMENT |
| | P.O. BOX 3366, WEST PALM BEACH, FL 33402 |
| | THE CERTIFICATION MUST INCLUDE THE |
| | BUILDING PERMIT NUMBER, THE ADDRESS OF |
| | THE PROPERTY AND THE NAME OF THE |
| | ESTABLISHMENT/PROJECT CONSTRUCTED. |
| | NO DUMPSTER SITE SHOWN.MUST MEET THE |
| | FOLLOWING; |
| | GARBAGE PICK-UP: |
| | STATE IF GARBAGE IS TO BE PICKED UP BY |
| | CITY OR IF IT IS PRIVATE PICKUP, IF TO |
| | BE PICKED UP BY THE CITY THEN THE |
| | FOLLOWING REQUIREMENTS MUST BE MET: |
| | 1.DUMPSTER MUST HAVE A MINIMUM OF 12'-6" |
| | OPENING BETWEEN THE GATE POSTS. |
| | 2.INTERIOR DIMENSIONS OF THE ENCLOSURE |
| | MUST BE A MINIMUM OF 12'-6" WIDE AND 12' |
| | DEEP.A CONCRETE PARKING STOP BARS 10' |
| | LONG MUST BE CENTERED (FROM GATES) AND |
| | INSTALLED 18" FROM THE BACK WALL. |
| | STEEL BARS WILL BE DRILLED THRU THE STOP |
| | BAR AND INTO THE INTERIOR FLOOR OF THE |
| | ENCLOSURE TO STOP THE BAR FROM MOVING |
| | WHEN THE DUMPSTER IS SET INSIDE. |
| | 3.THE OPENING OF THE DUMPSTER ENCLOSURE |
| | MUST BE ANGLED SO THAT A 40' LONG TRUCK |
| | WITH THE FORKS EXTENDED CAN APPROACH THE |
| | OPENING AND PICK UP THE DUMPSTER WITHOUT |
| | TURNING A SHARP TURN. |
| | 4.THE TRUCK NEEDS TO HAVE NO LESS THAN A |
| | 16' HIGH VERTICAL CLEARANCE AREA FOR THE |
| | TRUCK TO PICK UP THE DUMPSTER. THE CLEAR |
| | AREA MUST OVER THE DUMPSTER AND WHERE |
| | THE TRUCK WILL BE STOPPED TO UNLOAD THE |
| | DUMPSTER. |
| | 5.THE TRUCK NEEDS TO HAVE NO LESS THAN |
| | 14' HIGH VERTICAL CLEARANCE AND 12' |
| | HORIZONTAL CLEARANCES FOR THE TRUCK TO |
| | DRIVE THROUGH. |
| | 6.IT IS STRONGLY SUGGESTED THAT YOU ADD |
| | A RECYCLING CENTER TO YOUR DUMPSTER |
| | ENCLOSURE. |
| | 7.SEE ATTACHED STANDARD DETAIL FOR |
| | FURTHER INFORMATION. |