| 2001-01-08 00:00:00 | 4.THE TRUCK NEEDS TO HAVE NO LESS THAN A |
| | 16' HIGH VERTICAL CLEARANCE AREA FOR THE |
| | TRUCK TO PICK UP THE DUMPSTER. THE CLEAR |
| | AREA MUST OVER THE DUMPSTER AND WHERE |
| | THE TRUCK WILL BE STOPPED TO UNLOAD THE |
| | DUMPSTER. |
| | |
| | 5.THE TRUCK NEEDS TO HAVE NO LESS THAN |
| | 14' HIGH VERTICAL CLEARANCE AND 12' |
| | HORIZONTAL CLEARANCES FOR THE TRUCK TO |
| | DRIVE THROUGH. |
| | |
| | 6.IT IS STRONGLY SUGGESTED THAT YOU ADD |
| | A RECYCLING CENTER TO YOUR DUMPSTER |
| | ENCLOSURE. |
| | |
| | 7.THE GARBAGE TRUCK WILL NOT BE ABLE TO |
| | DRIVE INTO THE DUMPSTER AS DRAWN, IT |
| | SHOULD BE AT A 45 DEGREE ANGLE TO THE |
| | ALLEY WITH THE GATE FACING NORTHWEST. |
| | |
| | (CITY) IRRIGATION AND LANDSCAPE CONFLICT |
| | REQUIREMENTS: |
| | |
| | 1.ANY LANDSCAPE DISRUPTED BY |
| | CONSTRUCTION SHALL BE REPAIRED AND OR |
| | REPLACED AT THE CONTRACTORS EXPENSE. |
| | |
| | 2.IT IS THE CONTRACTORS RESPONSIBILITY |
| | TO MAINTAIN ANY CITY OWNED LANDSCAPING |
| | IF THE IRRIGATION SYSTEM IS DISRUPTED. |
| | |
| | 3.ANY TREES NEEDING TO BE REMOVED AND OR |
| | RELOCATED SHALL BE AT THE DIRECTION OF |
| | THE GROUNDS OPERATIONS DIVISION |
| | SUPERINTENDENT (659-8044) AT THE |
| | CONTRACTORS EXPENSE. |
| | |
| | 4.ANY IRRIGATION SYSTEM REPAIRED OR |
| | REPLACED OR ANY CONDUITS LAID FOR FUTURE |
| | SYSTEMS SHALL BE AT THE DIRECTION OF THE |
| | GROUNDS OPERATIONS DIVISION |
| | SUPERINTENDENT AT THE CONTRACTORS |
| | EXPENSE AND SHALL BE "AS-BUILT" BY THE |
| | CONTRACTOR THRU A PE OR LAND SURVEYOR. |
| | A COPY OF THE IRRIGATION AS-BUILTS WILL |
| | BE SUBMITTED TO ENGINEERING FOR THEIR |
| | RECORDS. |
| | |
| | ENG REVIEW 3 AND 4 REPLACE ENG REVIEW |
| | 1 & 2. |