| Date |
Text |
| 2001-01-08 00:00:00 | SIDEWALK AND DRIVEWAY REQUIREMENTS: |
| | 1.ALL BROKEN SIDEWALKS ALONG THE |
| | PROPERTY (ALL SIDES) MUST BE REPLACED. |
| | 2.ALL DRIVEWAYS THAT WILL NOT BE USED |
| | MUST BE REMOVED AND THE REGULAR CURBS (& |
| | GUTTERS) MUST BE REPLACED. |
| | 3.ALL BROKEN UP CURBS (& GUTTERS) MUST |
| | BE REPLACED. |
| | 4.ALL DRIVEWAY APPROACHES MUST BE (AT A |
| | MINIMUM) PER CITY STANDARD DETAIL INDEX. |
| | 5.ALL GRADES FOR CITY SIDEWALKS WILL BE |
| | SET BY THE CITY SURVEY CREW, CALL 659- |
| | 8040 AND ASK FOR ED RYAN TO SET UP AN |
| | APPOINTMENT. |
| | SANITATION: |
| | IF GARBAGE IS TO BE PICKED UP BY CITY OR |
| | IF IT IS PRIVATE PICKUP, IF TO BE PICKED |
| | UP BY THE CITY THEN THE FOLLOWING |
| | REQUIREMENTS MUST BE MET.IF THE |
| | CONTRACTOR WISHES TO CHANGE ANY OF THE |
| | FOLLOWING REQUIREMENTS HE WILL NEED TO |
| | MEET WITH PETE SPATARA OF THE SANITATION |
| | DIVISION AND SUBMIT THE CHANGES TO |
| | BUILDING AND ZONING FOR INCLUSION IN THE |
| | BUILDING PLAN SETS: |
| | 1.DUMPSTER MUST HAVE A MINIMUM OF 12'-6" |
| | OPENING BETWEEN THE GATE POSTS. |
| | 2.INTERIOR DIMENSIONS OF THE ENCLOSURE |
| | MUST BE A MINIMUM OF 12'-6" WIDE AND 12' |
| | DEEP.A CONCRETE PARKING STOP BARS 10' |
| | LONG MUST BE CENTERED (FROM GATES) AND |
| | INSTALLED 18" FROM THE BACK WALL.STEEL |
| | BARS WILL BE DRILLED THRU THE STOP BAR |
| | AND INTO THE INTERIOR FLOOR OF THE |
| | ENCLOSURE TO STOP THE STOP BAR FROM |
| | MOVING WHEN THE DUMPSTER IS SET INSIDE. |
| | 3.THE OPENING OF THE DUMPSTER ENCLOSURE |
| | MUST BE ANGLED SO THAT A 40' LONG TRUCK |
| | WITH THE FORKS EXTENDED CAN APPROACH THE |
| | OPENING AND PICK UP THE DUMPSTER WITHOUT |
| | MAKING A SHARP TURN. |
| | 4.THE TRUCK NEEDS TO HAVE NO LESS THAN A |
| | 16' HIGH VERTICAL CLEARANCE AREA FOR THE |
| | TRUCK TO PICK UP THE DUMPSTER. THE CLEAR |
| | AREA MUST OVER THE DUMPSTER AND WHERE |
| | THE TRUCK WILL BE STOPPED TO UNLOAD THE |
| | DUMPSTER. |
| | 5.THE TRUCK NEEDS TO HAVE NO LESS THAN |
| | 14' HIGH VERTICAL CLEARANCE AND 12' |
| | HORIZONTAL CLEARANCES FOR THE TRUCK TO |
| | DRIVE THROUGH. |
| | 6.IT IS STRONGLY SUGGESTED THAT YOU ADD |
| | A RECYCLING CENTER TO YOUR DUMPSTER |
| | ENCLOSURE. |
| | 7.THE GARBAGE TRUCK WILL NOT BE ABLE TO |
| | DRIVE INTO THE DUMPSTER AS DRAWN, IT |
| | SHOULD BE AT A 45 DEGREE ANGLE TO THE |
| | ALLEY WITH THE GATE FACING NORTHWEST. |
| | (CITY) IRRIGATION AND LANDSCAPE CONFLICT |
| | REQUIREMENTS: |
| | 1.ANY LANDSCAPE DISRUPTED BY |
| | CONSTRUCTION SHALL BE REPAIRED AND OR |
| | REPLACED AT THE CONTRACTORS EXPENSE. |
| | 2.IT IS THE CONTRACTORS RESPONSIBILITY |
| | TO MAINTAIN ANY CITY OWNED LANDSCAPING |
| | IF THE IRRIGATION SYSTEM IS DISRUPTED. |
| | 3.ANY TREES NEEDING TO BE REMOVED AND OR |
| | RELOCATED SHALL BE AT THE DIRECTION OF |
| | THE GROUNDS OPERATIONS DIVISION |
| | SUPERINTENDENT (659-8044) AT THE |
| | CONTRACTORS EXPENSE. |
| | 4.ANY IRRIGATION SYSTEM REPAIRED OR |
| | REPLACED OR ANY CONDUITS LAID FOR FUTURE |
| | SYSTEMS SHALL BE AT THE DIRECTION OF THE |
| | GROUNDS OPERATIONS DIVISION |
| | SUPERINTENDENT AT THE CONTRACTORS |
| | EXPENSE AND SHALL BE "AS-BUILT" BY THE |
| | CONTRACTOR THRU A PE OR LAND SURVEYOR. |
| | A COPY OF THE IRRIGATION AS-BUILTS WILL |
| | BE SUBMITTED TO ENGINEERING FOR THIER |
| | RECORDS. |