| 2001-01-08 00:00:00 | CHECKLIST: |
| | 1-PLEASE REVISE ALL ORIGINAL DRAWINGS |
| | SHOWING ALL THE CORRECTIONS/ |
| | CLARIFICATIONS REQUESTED ON PLANS. |
| | 2-REVISE FOOTING F-2. SEE RECOMMENDATION |
| | ON SOIL TEST REPORT FOR MINIMUM SIZE |
| | OF CONTINUOUS FOOTINGS. REVISE DWG. |
| | 3-PROVIDE PRODUCT APPROVAL FOR: ENTRY |
| | DOORS WITH SIDELITES ASSEMBLY, WINDOW |
| | AND DOOR MULLIONS, ROOF TILE, GARAGE |
| | DOOR. |
| | NOTE: NORANDEX PRODUCT APPROVALS ARE |
| | NOT ACCEPTED UNLESS THEY PROVIDE SITE |
| | SPECIFIC COMPLETE ENGINEERING |
| | CALCULATIONS OR APPROVED PRODUCT |
| | APPROVAL. |
| | 4-STORM PANELS: |
| | -INSTALLATION SCHEDULE, KEY PLAN AND |
| | ENGINEER FLOOR PLANS DON'T MATCH. |
| | REVISE AS REQUIRED. |
| | 5-PROVIDE SAFETY GLASS AS REQUIRED. SEE |
| | PLANS FOR COMMENTS.SEC 2405.2 SBC 1997 |
| | 6-MASTER BEDROOM OPTION OF HAVING 34/5 |
| | SINGLE HUNG WINDOW (SHEET A-2) DOESN'T |
| | MEET THE MINIMUM EGRESS REQUIREMENTS |
| | SEC. 1005.4.4 SBC 1997. |
| | 7-UPDATE ALL ENGINEERED TRUSSES: |
| | -REVISE MEAN ROOF HEIGHT.SEE ELEVATIONS |
| | -DESIGN CRITERIA ACCEPTED BY THIS |
| | OFFICE IS SBC 1997 OR ASCE 7-95 AND |
| | MUST BE INCORPORATED IN THE ENGINEERED |
| | TRUSSES (CUT AND PASTE JOB WILL NOT BE |
| | ACCEPTED). |
| | 8-PROVIDE COMPLETE SECTION/DETAIL AT |
| | MIDDLE BEARING POINT OF TRUSS D-16. |
| | SPECIFY ALL CONNECTORS (TOP & BOTTOM) |
| | SEC. 104.2.2 CITY AMENDMENTS. |
| | NOTE: ENGINEERED TRUSS DRAWING D-16 |
| | CALLS FOR A BEARING SIZE OF 5".8.CHECK |
| | 9-PROVIDE COMPLETE BUCK DETAILS FOR ALL |
| | EXTERIOR WINDOW TYPES, ALL EXTERIOR |
| | DOOR TYPES AND GARAGE DOOR. |
| | 10-NOTE: |
| | FLOOD ZONE A8. PROVIDE ELEVATION |
| | CERTIFICATE. |
| | 11-PAY IMPACT FEES TO THE COUNTY. |
| | 12-OWES $25.36 TO CITY FOR RADON FEES. |