| Date |
Text |
| 2001-01-08 00:00:00 | |
| | APPROVED WITH PROVISO: |
| | 1-PROVIDE ATTIC ACCESS AT MAIN ROOF AND |
| | AT GUEST SUITE. SEC 2309.6 SBC 1997. |
| | 2-PROVIDE PRODUCT APPROVAL FOR |
| | HORIZONTAL SLIDERS,ENTRY DOORS. |
| | 3-CEILING FAN IN LIBRARY IS NOT OPTIONAL |
| | BECAUSE CREDIT WAS TAKEN FOR CEILING |
| | FANS IN THE ENERGY CALCULATIONS. |
| | REVISE PLANS AS REQUIRED. |
| | 4-PROVIDE COMPLETE INSTALLATION SPECS |
| | FOR CEILINGS AT FRONT AND REAR PORCHES |
| | NOTE: FRONT CEILING CALLS FOR STUCCO |
| | CEILING AND REAR PORCH CALLS FOR |
| | DRYWALL CEILING. SEC 2504 SBC 1997. |
| | 5-UPDATE ALL TRUSS DRAWINGS: |
| | -DESIGN CRITERIA TO BE EITHER SBC 1997 |
| | OR ASCE 7-95. DESIGN CRITERIA MUST BE |
| | SPECIFIED ON ENGINEERED DRAWINGS. |
| | -TRUSS DRAWINGS TO BE REVIEWED BY |
| | DESIGNER OF RECORD PRIOR TO SUBMITTAL. |
| | -TRUSS LAYOUT TO BE SIGNED, SEALED AND |
| | DATED BY TRUSS ENGINEER. |
| | -PROVIDE TWO COPIES OF ENGINEERED |
| | DRAWINGS, SIGNED, SEALED AND DATED. |
| | -UPDATE ALL SUPPORTING DETAILS USING |
| | SBC 97 OR ASCE 7-95. |
| | 6-REVISE THE DESIGN CERTIFICATION FOR |
| | BUILDING CODE COMPLIANCE FORM. MEAN |
| | ROOF HEIGHT AND BASIC VELOCITY |
| | PRESSURE ARE INCORRECT. |
| | TABLE 1606.2A SBC 1997. |
| | CLARIFY WHAT RESPONSIBILITY IS ROBERT |
| | AGSTEN, THE ENGINEER, ASSUMING. |
| | NONE OF THE DRAWINGS ARE SIGNED AND |
| | SEALED BY HIM, EXCEPT FOR THE DESIGN |
| | CERTIFICATION FOR BUILDING CODE |
| | COMPLIANCE FORM. |
| | 7-STORM PANELS: |
| | -PROVIDE INSTALLATION SCHEDULE AND KEY |
| | PLAN. HIGHLIGHT SPECIFIC MOUNTING |
| | CONDITIONS AND ANCHORS TO BE USED. |