Plan Review Notes
Plan Review Notes For Permit 99090280
Permit Number 99090280
Review Stop ENG
Sequence Number 2
Notes
Date Text
2001-01-08 00:00:00PASSED WITH PREVISOS:
 THE DRIVEWAYS MUST CONCRETE PER CITY
 STANDARDS (IF REPLACED).
 THE FOLLOWING MUST BE SUBMITTED SIGNED
 AND SEALED BY A FLORIDA PROFESSIONAL
 ENGINEER (PE).
 3.HYDRAULIC COMPUTATIONS AND SUPPORTING
 DOCUMENTATION
 4.IMPERVIOUS AREA COMPUTATIONS
 A COPY OF THE POLLUTION PREVENTION
 PLAN SHALL BE KEPT ON SITE AT ALL
 TIMES DURING CONSTRUCTION. THE PLAN
 SHALL BE INSTALLED IN THE FIELD PRIOR TO
 ANY EARTHWORK. THE ENGINEER OF RECORD
 SHALL CERTIFY TO THE CITY, ON A MONTHLY
 BASIS, THAT THE PLAN IS WORKING PROPERLY
 AND AS DESIGNED. THE ENGINEER OF RECORD
 IS RESPONSIBLE TO CERTIFY IMPLEMENTATION
 OF THE PROVISIONS OF CITY ORDINANCE NO.
 3132-98 OF THE CITY CODE AT SUCH TIME
 THE PERMITTEE APPLIES FOR A CERTIFICATE
 OF OCCUPANCY FROM THE CITY BUILDING
 OFFICIAL.
 6.EVERY SIX MONTHS AFTER CONSTRUCTION A
 PE SHALL CERTIFY THAT THE PERMANENT
 POLLUTION PREVENTION STRUCTURES, DRY-WET
 WATER DETENTION FACILITIES, AND
 EXFILTRATION SYSTEMS ARE WORKING AS
 DESIGNED AND ARE IN GOOD OPERATING
 CONDITION. ALL CERTIFICATIONS MUST BE
 SUBMITTED TO:
 STORM WATER UTILITY ENGINEER
 CITY OF WEST PALM BEACH PUBLIC UTILITIES
 DEPARTMENT
 P.O. BOX 3366, WEST PALM BEACH, FL 33402
 THE CERTIFICATION MUST INCLUDE THE
 BUILDING PERMIT NUMBER, THE ADDRESS OF
 THE PROPERTY AND THE NAME OF THE
 ESTABLISHMENT/PROJECT CONSTRUCTED.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved