| 2001-01-08 00:00:00 | APPROVED WITH PROVISO: |
| | 1-SOIL TEST REPORT INDICATES SOME AREAS |
| | HAVE ORGANIC MATERIALS.INSPECT LOCATION |
| | WHERE HOUSE IS GOING TO BE BUILT AND |
| | REMOVE AND REFILL AREA IF REQUIRED. |
| | 2-FLOOD ZONE A0. PROVIDE ELEVATION |
| | CERTIFICATE. |
| | 3-PROVIDE UPDATE PRODUCT APPROVAL AND |
| | COPY OF TESTING AS PER CHAPTER 17 SBC |
| | 1997 FOR NORANDEX ALUMINUM MULLIONS, |
| | FIXED WINDOWS,SINGLE HUNG WINDOWS AND |
| | SLIDING GLASS DOORS. |
| | 4-UPDATE DESIGN CERTIFICATION FOR BLDG |
| | CODE COMPLIANCE FORM. SBC 1997. |
| | NOTE: THIS FORM IS NOT REQUIRED IF ALL |
| | THE INFORMATION IS SPECIFIED ON PLANS. |
| | 5-STORM PANELS: PROVIDE COMPLETE |
| | INSTALLATION SCHEDULE AND KEY PLAN AS |
| | PER CITY POLICY. SEE ATTACHED. |
| | STORM SHUTTERS TO BE UNDER A SEPARATE |
| | PERMIT. |
| | 6-PROVIDE CURRENT PRODUCT APPROVAL FOR |
| | ENTRY DOOR. IT'S EXPIRED. |
| | 7-REVISE ENGINEERED TRUSS DRAWINGS. |
| | *DESIGN CRITERIA SHALL STATE THE |
| | SPECIFIC YEAR OF SBC USED. 1997. |
| | *SOME TRUSSES ARE DESIGNED USING SBC |
| | AND SOME TRUSSES ARE DESIGNED USING |
| | ASCE-7-93. REVISE AS REQUIRED. DESIGNER |
| | OF RECORD IS USING SBC. |
| | *ENGINEERED TRUSS C-3 IS MISSING. |
| | *DESIGNER OF RECORD TO REVIEW ALL TRUSS |
| | DRAWINGS AFTER CORRECTIONS ARE DONE. |