| 2001-01-08 00:00:00 | 1- PG. E-1SHOWS A REFERENCE TO THE |
| | HEIGHT OF FIXTURES IN THE STAIRWELLS |
| | AND CORIDOORS AT 74" LIFE SAFTEY 101 |
| | HAS A MINIMUM OF 6'8" ABOVE FINISHED |
| | FLOOR UNLESS IT IS FLUSH WITH THE WAL |
| | |
| | 2- PG. E-3 HAS A REFERENCE TO THE |
| | LOCATION AND NUMBER OF SMOKE DETECTOR |
| | IN THE UNITS NFPA 72 REQUIRES THEM TO |
| | BE INSIDE AND OUTSIDE OF EACH BDRM. |
| | THE NOTE REFERENCES THE FIRE DEPT. |
| | THEY DONT DO ROUGH INSPECTIONS!! |
| | DETECTORS WILL BE PER PLAN AND CODE. |
| | 1996 NFPA 70 ADOPTED NFPA 72 WHICH |
| | CALLS FOR THE DETECTORS AS STATED |
| | ABOVE. |
| | |
| | PG. E-4 PANELS X, XR, AND HR SHOW NO |
| | AIC RATINGS FOR THE PANEL AND BREAKER |
| | PLEASE LIST IN THE DESCRIPTION OF THE |
| | PANEL AS SHOWN ON OTHER PANELS |
| | |
| | PG E-4 GNEERATOR SHOWS THE MAIN ON THE |
| | SECOND FLOOR!230-72(B) REQUIRES IT |
| | TO BE WITH THE NORMAL MAINS BUT NOT |
| | RIGHT NEXT TO THEM, REMOTE WHICH CAN |
| | BE AS LITTLE AS 10'!!!! PER NFPA |
| | |
| | PG E-42500 AMP FEED TO SECOND FLOOR FOR |
| | APT. MAINS NEEDS TO BE ENCASED IN |
| | 2" OF CONCRETE, BRICK, OR TILE!!!!! |
| | |
| | PR E-4 SAME FOR THE FIRE PUMP!!!!!!!!! |
| | |
| | PG E-4 THERE IS ALSO NO REFERENCE TO THE |
| | PLAQUES THAT ARE REQUIRED AT EACH OF |
| | THE THREE SERVICES SHOWING THE |
| | LOCATIONS OF THE OTHER SERVICES. |
| | 230-2(E) |