| Date |
Text |
| 2001-01-08 00:00:00 | APPROVED WITH PROVISO: |
| | 1-PROVIDE SAFETY GLASS WHERE REQUIRED. |
| | SEC. 2504.2 SBC 1994.SEE PLANS. |
| | PROVIDE PRODUCT APPROVAL OF WINDOWS |
| | WITH SAFETY GLASS RESPECTIVELY. |
| | 2-PROVIDE ENGINEERED CALCULATIONS,SPECS |
| | AND COMPLETE INSTALLATION DETAILS FOR |
| | WINDOW ABOVE GLASS BLOCK AT MASTER BATH |
| | SEC. 104.2 CITY AMENDMENTS. |
| | 3-PROVIDE 2 COPIES OF PRODUCT APPROVALS: |
| | *ROOF TILE AND BUILT UP ROOF UNDER A |
| | SEPARATE PERMIT (NO SUB ON APPLICATION) |
| | *BUTT GLAZING: ORIGINALS SIGNED AND |
| | SEALED AND SPECIFY FRAMING CONDITIONS |
| | AND ALL FASTENERS. |
| | *ARABESQUE WINDOW. |
| | *SLIDING GLASS DOORS,CIRCLE TOP WINDOWS |
| | BBQ AND FIREPLACE. ONLY ONE COPY WAS |
| | SUBMITTED. |
| | 4-STORM PANELS: |
| | *PROVIDE COMPLETE INSTALLATION SCHEDULE |
| | AS PER CITY POLICY SAMPLE. |
| | *HIGHLIGHT SPECIFIC MOUNTING CONDITIONS |
| | AND ANCHORS AND SPACING TO BE USED. |
| | *REVISE KEY PLAN TO MATCH ARCHITECT'S |
| | PLANS. |
| | 5-PROVIDE ORIGINALS COPIES OF SOIL TEST |
| | REPORT, SIGNED AND SEALED. |
| | 6-SEE COMMENTS ON PLANS FOR ADDITIONAL |
| | REQUIRED INFORMATION. |
| | 7-PROVIDE PRODUCT APPROVAL FOR FIXED |
| | ROUND WINDOW ABOVE ENTRY DOORS. |
| | 8-PROVIDE COMPLETE FRAMING DETAILS AT |
| | TRANSITION FROM CONCRETE BLOCK WALLS TO |
| | WOOD FRAMING. |
| | 9-PROVIDE SPECIFICATIONS OF HOW TO |
| | COMPLY WITH SECTION 402.7 SGC 1994 FOR |
| | INSTALLATION OF GAS APPLIANCES IN THE |
| | GARAGE. |