| Plan Review Notes For Permit 23060831 |
| Permit Number |
23060831 |
|
| Review Stop |
NFIP |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2023-07-27 11:01:37 | NFIP REVIEW: | | | | | | 1- THIS PROPERTY IS LOCATED IN AE FLOOD ZONE WITH A | | | BASE FLOOD ELEVATION (BFE) OF 6 FEET BASED ON NAVD 88. | | | THE PROPOSED SCOPE OF WORK IS CONSIDERED A SUBSTANTIAL | | | IMPROVEMENT. THE FINISH FLOOR ELEVATION NEEDS TO BE | | | ELEVATED TWO FEET ABOVE THE BASE FLOOD ELEVATION. CITY | | | ORDINANCE 4729-17. | | | | | | REVISE FLOOR PLANS: | | | REVISE FINISH FLOOR ELEVATION ON ALL PLANS, INCLUDING | | | FOUNDATION PLAN. NEED TO USE NAVD 1988 ELEVATION DATUM | | | NOT NGVD. ALSO, NEED TO SPECIFY THE OUTDOOR EQUIPMENT | | | ELEVATION. REVISE ALL PLANS. SEC. 107.2.1 CITY | | | AMENDMENTS. | | | NOTE: COORDINATE WITH ITEM #2 BELOW. | | | SPECIFY FINISH FLOOR ELEVATION ON ALL PLANS, INCLUDING | | | FOUNDATION PLAN. | | | | | | 2- NEED TO PROVIDE THE CONSTRUCTION DRAWINGS ELEVATION | | | CERTIFICATE AND SURVEY SHOWING ALL ELEVATIONS FOR | | | VERIFICATION. | | | SEC. 107.2.1 CITY AMENDMENTS. | | | | | | NOTE: DURING THE CONSTRUCTION OF THIS STRUCTURE THREE | | | DIFFERENT FLOOD ELEVATION CERTIFICATES WILL BE | | | REQUIRED: | | | (A)CONSTRUCTION DRAWINGS. | | | (B)BUILDING UNDER CONSTRUCTION. | | | (C)FINISHED CONSTRUCTION. | | | | | | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY | | | QUESTIONS REGARDING THESE COMMENTS, | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | DEVELOPMENT SERVICES DEPARTMENT | | | BUILDING DIVISION | | | (561)805-6712 | | | [email protected] |
|