| Date |
Text |
| 2023-07-21 13:33:57 | (1) DIGITAL SIGNATURE REVIEW. |
| | (A)GEOTECHNICAL REPORT: |
| | ENGINEER'S DIGITAL SIGNATURE DOESN'T COMPLY WITH THE |
| | REQUIREMENTS OF FBPE. NEED A SEPARATE TEXT BOX WITH THE |
| | TEXT BOX LANGUAGE IDENTICAL TO THE SAMPLES SHOWN BY |
| | FBPE. |
| | SEE FBPE.ORG/LEGAL/SIGNING-AND-SEALING-ENGINEERING-DOCU |
| | MENTS/ AND REVISE DIGITAL SIGNATURE AS REQUIRED. |
| | NOTE: THIS WAS CONFIRMED WITH THE FBPE INVESTIGATOR. |
| | |
| | 61G15-23.004 PROCEDURES FOR DIGITALLY SIGNING AND |
| | SEALING ELECTRONICALLY TRANSMITTED PLANS, |
| | SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS. |
| | |
| | (B)PLUMBING PLANS SUBMITTED: |
| | ENGINEER'S DIGITAL SIGNATURE DOESN'T COMPLY WITH THE |
| | REQUIREMENTS OF FBPE. NEED A SEPARATE TEXT BOX WITH THE |
| | TEXT BOX LANGUAGE IDENTICAL TO THE SAMPLES SHOWN BY |
| | FBPE. |
| | SEE FBPE.ORG/LEGAL/SIGNING-AND-SEALING-ENGINEERING-DOCU |
| | MENTS/ AND REVISE DIGITAL SIGNATURE AS REQUIRED. |
| | NOTE: THIS WAS CONFIRMED WITH THE FBPE INVESTIGATOR. |
| | |
| | 61G15-23.004 PROCEDURES FOR DIGITALLY SIGNING AND |
| | SEALING ELECTRONICALLY TRANSMITTED PLANS, |
| | SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS. |
| | |
| | (C)ELECTRICAL PLAN E1.1 SUBMITTED: |
| | ENGINEER'S DIGITAL SIGNATURE DOESN'T COMPLY WITH THE |
| | REQUIREMENTS OF FBPE. NEED A SEPARATE TEXT BOX WITH THE |
| | TEXT BOX LANGUAGE IDENTICAL TO THE SAMPLES SHOWN BY |
| | FBPE. |
| | SEE FBPE.ORG/LEGAL/SIGNING-AND-SEALING-ENGINEERING-DOCU |
| | MENTS/ AND REVISE DIGITAL SIGNATURE AS REQUIRED. |
| | NOTE: THIS WAS CONFIRMED WITH THE FBPE INVESTIGATOR. |
| | |
| | 61G15-23.004 PROCEDURES FOR DIGITALLY SIGNING AND |
| | SEALING ELECTRONICALLY TRANSMITTED PLANS, |
| | SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS. |
| | |
| | PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY |
| | QUESTIONS REGARDING THESE COMMENTS, |
| | JULIO GOMEZ |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | DEVELOPMENT SERVICES DEPARTMENT |
| | BUILDING DIVISION |
| | (561)805-6712 |
| | [email protected] |
| | |