| Plan Review Notes For Permit 23041316 |
| Permit Number |
23041316 |
|
| Review Stop |
SIGNATURE |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2023-05-09 16:47:46 | SIGNATURE REVIEW: | | | | | | 1- ENGINEER'S DIGITAL SIGNATURE DOESN'T COMPLY WITH THE | | | REQUIREMENTS OF FBPE. NEED A SEPARATE TEXT BOX WITH THE | | | TEXT BOX LANGUAGE IDENTICAL TO THE SAMPLES SHOWN BY | | | FBPE. | | | SEE FBPE.ORG/LEGAL/SIGNING-AND-SEALING-ENGINEERING-DOCU | | | MENTS/??? AND REVISE DIGITAL SIGNATURE AS REQUIRED. | | | | | | SEC. 61G15-23.004 F.A.C. . PROCEDURES FOR DIGITALLY | | | SIGNING AND SEALING ELECTRONICALLY TRANSMITTED PLANS, | | | SPECIFICATIONS, REPORTS OR OTHER DOCUMENTS. |
|