| Date |
Text |
| 2023-05-08 09:00:43 | JONATHAN BROOKS JR. |
| | BUILDING PLANS EXAMINER |
| | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM |
| | PHONE (561) 805-6656 |
| | EMAIL: [email protected] |
| | |
| | 1ST REVIEW: FBC 2020 7TH EDITION |
| | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) |
| | FBC B = FBC BUILDING |
| | FBC R = FBC RESIDENTIAL |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC EC = FBC ENERGY CONSERVATION |
| | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC |
| | RESULTS: DENIED |
| | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| | TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT |
| | CITY HALL, OR UPLOAD CORRECTIONS TO PROJECTDOX. |
| | |
| | 1. FBC B 107.2.1 SUBMITTED PRODUCT APPROVAL FL16440-R24 |
| | (HVHZ) IS NOT APPROVED FOR USE OUTSIDE HVHZ. CITY OF |
| | WEST PALM BEACH IS NOT LOCATED IN A HVHZ. YOU MIGHT |
| | CONSIDER USING FL14083-R28 (NON-HVHZ). PROVIDE THE |
| | FOLLOWING: COVER PAGE, EVALUATION REPORTS PAGES 1-5 TO |
| | INCLUDE LIMITATIONS PAGE(S) AND INSTALLATION |
| | INSTRUCTIONS FOR SYSTEM USED. SELECT SYSTEM THAT MEETS |
| | OR EXCEEDS EXPOSURE CATEGORY C MINIMUM DESIGN PRESSURE |
| | ZONE 3 REQUIREMENTS OF -108.17. SIGNED AND SEALED |
| | NAILING CALCULATIONS MAY BE REQUIRED. |
| | 2. PROVIDE FIELD UPLIFT TESTING IN ACCORDANCE WITH |
| | TESTING APPLICATION STANDARD TAS 124 AS REQUIRED BY |
| | LIMITATIONS 5.6.1 OF PRODUCT APPROVAL FL14083. |
| | 3. FBC EB 706.3(1) PROVIDE A SIGNED AND SEALED MOISTURE |
| | REPORT PREPARED BY A FLORIDA REGISTERED DESIGN |
| | PROFESSIONAL. |
| | 4. FBC B 107.2.1 PROVIDE A SIGN AND SEALED ROOF |
| | DRAINAGE PLAN THAT COMPLIES WITH SECTION 1503 OF THE |
| | 2020 FBC-BUILDING AND CHAPTER 11 OF THE 2020 |
| | FBC-PLUMBING. |
| | 5. FBC B 107.2.1 FOR CLARITY PLEASE REVISE ROOF |
| | DIAGRAM/SKETCH AND SHOW THE AREAS TO RECEIVE NEW |
| | ROOFING CLEARLY IDENTIFIED ON DRAWING; INCLUDE ROOF |
| | SLOPE(S), MEAN ROOF HEIGHT(S). |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | |