| 2023-07-26 09:29:35 | PETER E VALENTI |
| | BUILDING PLANS EXAMINER II/INSPECTOR |
| | [email protected] |
| | 561 805 6673 |
| | |
| | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) |
| | FBC B = FBC BUILDING |
| | FBC R = FBC RESIDENTIAL |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC EC = FBC ENERGY CONSERVATION |
| | FBC M = FBC MECHANICAL |
| | FBC FG = FBC FUEL GAS |
| | |
| | BUILDING REVIEW DENIED: |
| | |
| | THE FOLLOWING ITEMS ARE REQUIRED PRIOR TO ISSUANCE OF A |
| | DEMO PERMIT PER FLORIDA BUILDING |
| | CODE, BUILDING 3303: |
| | |
| | |
| | 2. UTILITY RELEASE - FLORIDA PUBLIC UTILITIES (GAS) |
| | RELEASE OF SERVICE CONFIRMATION OR PROVIDE A LETTER |
| | FROM THE PLUMBING/GAS CONTRACTOR STATING THAT AREA OF |
| | GAS LINES WILL BE SAFE FOR DEMO WORK. |
| | |
| | 3. UTILITY RELEASE - CITY OF WEST PALM BEACH WATER |
| | DEPARTMENT, REQUEST FOR METER PULL, ON |
| | THEIR FORM "DEMOLITION APPLICATION" |
| | HTTP://WPB.ORG/DEPARTMENTS/DEVELOPMENT-SERVICES/FORMS/B |
| | UILDING-PERMIT-FORMS |
| | |
| | WATERDOWN METHOD: |
| | OBTAIN THE PERMIT AND A FINAL #703 PLUMBING FIELD |
| | INSPECTION FOR THE BACKFLOW PREVENTER PERMIT #23060034. |
| | |
| | 4. SEWER LATERAL CAPPING PERMIT IS REQUIRED; |
| | OBTAIN THE PERMIT AND THE FINAL PLUMBING INSPECTION |
| | #703 FOR PERMIT #23061185. |
| | |
| | 5. EXTERMINATION LETTER - LETTER FROM A LICENSED PEST |
| | CONTROL COMPANY STATING THAT |
| | DEMOLITION ADDRESS HAS BEEN INSPECTED AND/OR TREATED |
| | FOR RODENTS. |
| | |
| | 6. COMPLETE THE DEMO DEBRIS FORM: HTTP://WPB.ORG/DEPART |
| | MENTS/DEVELOPMENT-SERVICES/FORMS/BUILDING-PERMIT-FORMS |
| | IF THE FORM IS NOT AVAILABLE ONLINE, SEND A REQUEST FOR |
| | THE FORM TO [email protected]. |