| 2023-04-19 10:26:09 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| | MARSHAL, WITH THE FOLLOWING COMMENTS: |
| | |
| | 1) THERE IS AN INDICATION OF THE INSTALLATION OF |
| | LAMINATE, BUT NO SPEC SHEET NOR A PRODUCT NAME FOR THE |
| | ACTUAL PROPOSED LAMINATE FLOORING. |
| | |
| | LAMINATE FLOORING IS MANUFACTURED AROUND THE WORLD BUT |
| | NOT ALL ARE TESTED AND MEETING LISTED AND NFPA |
| | STANDARDS. |
| | |
| | PER NFPA 101, CH 30 |
| | |
| | 30.3.3.3 INTERIOR FLOOR FINISH. |
| | 30.3.3.1 GENERAL. INTERIOR FINISH SHALL BE IN |
| | ACCORDANCE WITH |
| | SECTION 10.2. |
| | |
| | 10.2.7.2* FLOOR COVERINGS, OTHER THAN CARPET FOR WHICH |
| | 10.2.2.2 |
| | ESTABLISHES REQUIREMENTS FOR FIRE PERFORMANCE, SHALL |
| | HAVE A |
| | MINIMUM CRITICAL RADIANT FLUX OF 0.1 W/CM2. |
| | |
| | FOR THE OFFICIAL RECORD, PLEASE PROVIDE THE LAMINATE |
| | FLOORING NAME AND THE PRODUCT SPEC SHEETS INDICATING |
| | THE FIRE BEHAVIOR RATING. |
| | |
| | IF THE PROPOSED FLOORING IS PORCELAIN/CERAMIC TILE, |
| | NATURAL STONE TILE, CONCRETE TILES, PRODUCT SPEC SHEETS |
| | WOULD NOT BE REQUIRED. |
| | |
| | PRODUCT SPEC SHEETS ARE REQUIRED FOR LVT, VINYL |
| | FLOORING, WOOD/VINYL LAMINATES, ETC. |
| | |
| | |
| | |
| | 2) THERE IS INDICATIONS OF DROP CEILINGS THAT AMY |
| | AFFECT FIRE SPRINKLER COVERAGE AND LOCATIONS THAT WILL |
| | REQUIRE MODIFICATIONS. |
| | |
| | THE FIRE SPRINKLER & FIRE ALARM SYSTEMS SHALL BE |
| | MAINTAINED THROUGHOUT DEMO & CONSTRUCTION PERIODS |
| | |
| | ANY WORK ON THE FIRE SPRINKLER & FIRE ALARM, INCLUDING |
| | DEMO, SHALL BE DONE UNDER SEPARATE PERMITS & SHOP |
| | DRAWINGS. |
| | |
| | |
| | |
| | WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET REVISION |
| | CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE ABOVE. |
| | |
| | |
| | 3) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE |
| | RE-SUBMITTAL OF THE ABOVE. |
| | |
| | |
| | PETER LEDUC |
| | FIRE MARSHAL |
| | 561-804-4709 |
| | [email protected] |
| | |