| 2023-06-16 09:56:09 | FAILED |
| | |
| | 1) UPDATED COMMENT: THE UPDATED SITE PLAN SHOWS THAT |
| | THE FENCE WILL BE LOCATED 2.5 FEET FROM THE PROPERTY |
| | LINE. WHEN COMPARED TO THE DIMENSIONS PROVIDED ON THE |
| | OVERHEAD PROTECTION CROSS SECTION DRAWING, THIS RESULTS |
| | IN THE CONCRETE BARRIER LOCATED IN THE VALLEY GUTTER, |
| | WHICH IS NOT PERMITTED. ALL DRAWINGS MUST SHOW |
| | CONSISTENT, ACCURATE DIMENSIONS FOR THE FENCE, THE |
| | OVERHEAD PROTECTION, THE CONCRETE BARRIERS, THE |
| | PROPERTY LINE AND THE VALLEY GUTTER LOCATIONS. |
| | |
| | 2) UPDATED COMMENT: THANK YOU FOR PROVIDING THE |
| | RIGHT-OF-WAY APPROVAL FOR GARDENIA AND HIBISCUS. STAFF |
| | HAS SPOKEN WITH ENGINEERING REGARDING ROSEMARY AND THEY |
| | HAVE ACKNOWLEDGED THAT THE RIGHT-OF-WAY PERMIT DOES NOT |
| | CURRENTLY INCLUDE THE USE OF ROSEMARY FOR THE |
| | INSTALLATION OF THE FENCE AND OVERHEAD COVER. PLEASE |
| | UPLOAD THE UPDATED RIGHT-OF-WAY PERMIT THAT COVERS |
| | ROSEMARY AVENUE PRIOR TO THE ZONING APPROVAL OF THIS |
| | PERMIT. |
| | |
| | 3) PLEASE NOTE THE TEMPORARY CONSTRUCTION FENCE TIMING |
| | REQUIREMENTS OUTLINED IN SECTION 94-446.D.2. ZONING |
| | WILL NOT APPROVE THE CONSTRUCTION FENCE PERMIT UNTIL |
| | THE PERMIT FOR THE BUILDING DEMOLITION IS APPROVED. |
| | |
| | 4) CONDITION: THE ZONING APPROVAL OF THE EIGHT-FOOT |
| | TALL TEMPORARY CONSTRUCTION FENCE IS ONLY FOR THE |
| | DEMOLITION PHASE OF THE PROJECT AND IS BASED ON THE |
| | PROXIMITY OF THE DEMOLITION ACTIVITY TO THE PROPERTY |
| | LINES. |
| | |
| | CONTACT ERIC SCHNEIDER @ 561-822-1446 |
| | [email protected] |
| | |