| 2023-05-10 09:54:55 | FAILED |
| | |
| | 1) PROVIDE THE SURVEY FOR THE C BLOCK. THE SURVEY SHALL |
| | SHOW THE LOCATIONS OF THE FIRE HYDRANTS THAT ARE |
| | REFERENCED ON THE SITE PLAN. |
| | |
| | 2) THE SITE PLAN MUST CLEARLY SHOW THE DIMENSION OF THE |
| | OVERHEAD PROTECTION AND THE LOCATION OF THE FIRE |
| | HYDRANTS. A REVIEW OF GOOGLE STREET VIEW IN |
| | RELATIONSHIP TO THE SITE PLAN SHOWS THAT THE HYDRANTS |
| | ARE NOT ON PRIVATE PROPERTY, NOR MORE THAN 8 FEET FROM |
| | THE CURB LINE (EDGE OF THE OVERHEAD PROTECTION |
| | LOCATION). YOU MUST CLEARLY DEMONSTRATE THAT THERE IS |
| | ADA CLEARANCE UNDER THE OVERHEAD PROTECTION AT THE |
| | LOCATION OF THE HYDRANTS. |
| | |
| | 3) THE PLANS INDICATE THAT THE FENCE ALONG ROSEMARY |
| | AVENUE WILL BE AT THE INSIDE EDGE OF THE OVERHEAD |
| | PROTECTION AND THUS WITHIN THE RIGHT-OF-WAY. THE |
| | GARDENIA STREET SECTION OF THE FENCE IS CLEARLY SHOWN |
| | IN THE RIGHT-OF-WAY. THE MAJORITY OF THE HIBISCUS |
| | STREET SECTION OF THE FENCE IS CLEARLY SHOWN IN THE |
| | RIGHT-OF-WAY. YOU MUST INCLUDE A COPY OF THE APPROVED |
| | RIGHT-OF-WAY PERMIT FOR THESE SECTIONS OF THE FENCE AND |
| | OVERHEAD PROTECTION PRIOR TO THE ZONING APPROVAL OF |
| | THIS PERMIT. |
| | |
| | 4) THE PROPOSED FENCE SHOWS THE ENCLOSURE OF A NUMBER |
| | OF ON-STREET PARKING SPACES. YOU MUST INCLUDE A COPY OF |
| | THE PAID INVOICE TO THE CITY'S PARKING DEPARTMENT FOR |
| | THE REMOVED PARKING SPACES PRIOR TO THE ZONING APPROVAL |
| | OF THIS PERMIT. |
| | |
| | 5) PROVIDE THE DETAILS OF THE WIND SCREEN FOR THE MESH |
| | PORTIONS OF THE FENCE, TO INCLUDE VERIFICATION THAT IT |
| | HAS NO LESS THAN 83 PERCENT OPACITY. |
| | |
| | 6) PLEASE NOTE THE TEMPORARY CONSTRUCTION FENCE TIMING |
| | REQUIREMENTS OUTLINED IN SECTION 94-446.D.2. ZONING |
| | WILL NOT APPROVE THE CONSTRUCTION FENCE PERMIT UNTIL |
| | THE PERMIT FOR THE BUILDING DEMOLITION IS APPROVED. |
| | |
| | 7) THE ZONING APPROVAL OF THE EIGHT-FOOT TALL TEMPORARY |
| | CONSTRUCTION FENCE IS ONLY FOR THE DEMOLITION PHASE OF |
| | THE PROJECT AND IS BASED ON THE PROXIMITY OF THE |
| | DEMOLITION ACTIVITY TO THE PROPERTY LINES. |
| | |
| | 8) PROVIDE VERIFICATION THAT THE SITE VISIBILITY CORNER |
| | DIMENSIONS AT THE CORNER OF ROSEMARY AVENUE AND |
| | HIBISCUS STREET ARE BEING MET. |
| | |
| | CONTACT ERIC SCHNEIDER @ 561-822-1446 |
| | [email protected] |
| | |