| Date |
Text |
| 2023-03-09 16:08:04 | 1ST REVIEW FBC-2020 PLUMBING |
| | PERMIT-23030516 |
| | 3/9/23 |
| | |
| | CODES IN EFFECT: |
| | FBC P- FLORIDA PLUMBING CODE 7TH EDITION 2020 |
| | FS- FLORIDA STATUTES |
| | FAC- FLORIDA ADMINISTRATIVE CODE |
| | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | |
| | 1) PLEASE NOTE A SEPARATE PERMIT IS REQUIRED FOR THE |
| | GREASE INTERCEPTOR AND DUE TO A CHANGE IN PROCESS THE |
| | PERMIT APPLICATION SHALL BE SUBMITTED PRIOR TO THE MAIN |
| | PLUMBING PLAN REVIEW APPROVAL. YOU CAN SUBMIT AN |
| | APPLICATION TBD (TO BE DETERMINED) IF YOU DO NOT HAVE A |
| | CONTRACTOR SELECTED BY EMAILING A COMPLETED PERMIT |
| | APPLICATION TO [email protected] . YOU WILL |
| | RECEIVE INSTRUCTIONS TO PAY FEES AND UPLOAD PLANS. YOU |
| | MAY UPLOAD PLANS AND PAY FEES AT A FUTURE DATE, BUT THE |
| | APPLICATION IS REQUIRED AT THIS TIME. WE RECOMMEND THAT |
| | YOU PAY FEES AND UPLOAD PLANS AT THE SAME TIME. AFTER |
| | YOU HAVE THE PERMIT(S) GENERATED, NOTIFY ME VIA EMAIL |
| | AND I WILL CHANGE THE REVIEW STATUS TO PASS. THE |
| | COMMENTS BELOW WILL APPLY TO BOTH THE MAIN PLUMBING |
| | PERMIT AND THE SEPARATE GREASE INTERCEPTOR PERMIT. |
| | |
| | 2) SUBMIT A MANUFACTURER'S SPECIFICATION SHEET FOR THE |
| | IRONWALLS INTERCEPTOR THAT INDICATES THE UNIT MEETS |
| | EITHER THE ASME AND/OR PDI DESIGN AND TESTING STANDARD |
| | FOR HYDROMECHANICAL GREASE INTERCEPTORS AS REQUIRED BY |
| | SEC. 1003.3.5; OR THE IAPMO/ANSI Z1001 STANDARD FOR |
| | GRAVITY GREASE INTERCEPTORS AS REQUIRED BY SEC. |
| | 1003.3.7 FBC P. I WAS UNABLE TO LOCATE TESTING STANDARD |
| | INFORMATION ONLINE FOR THE UNIT. |
| | |
| | 3) PROVIDE GREASE WASTE SIZING CALCULATIONS IN |
| | ACCORDANCE WITH SECS.1003.3.5 FBC P FOR HYDROMECHANICAL |
| | TYPES OR 1003.3.7 FOR GRAVITY TYPES. |
| | |
| | 4) WATER ISOMETRIC DRAWING: HOT WATER SHALL BE |
| | DELIVERED FROM THE 3-COMPARTMENT SINK AND THE HANDSINK |
| | HOWEVER THE DRAWING SHOWS ONLY COLD WATER BEING |
| | SUPPLIED TO THE FIXTURES- SEC. 607.1 FBC P. PLEASE NOTE |
| | A MEANS OF LIMITING THE HOT WATER TEMPERATURE AT THE |
| | FIXTURES SUCH AS ASSE APPROVED MIXING VALVES SHALL BE |
| | PROVIDED- SEC. 607.1.1 FBC P. |
| | |
| | 4) SANITARY ISOMETRIC: PLEASE CORRECT THE DRAWINGS PER |
| | ITEMS A, B, & C BELOW. PLEASE NOTE THAT INSTALLATION OF |
| | THE INTERCEPTOR AND ASSOCIATED PLUMBING PIPING SHALL BE |
| | IN COMPLIANCE WITH THE MANUFACTURER'S INSTALLATION |
| | GUIDELINES WHICH SHALL BE ONSITE FOR INSPECTION- SECS. |
| | 1003.3.5 & 1003.3.7 FBC P. |
| | |
| | A) THE INTERCEPTOR DISCHARGE PIPE SHALL BE DIRECTLY |
| | CONNECTED TO THE SANITARY DRAINAGE PIPE, NOT INDIRECTLY |
| | AS THE DRAWING SHOWS- SEC. 1003.3.8 FBC P. |
| | |
| | B) BASED ON OTHER MANUFACTURER'S INSTALLATION |
| | GUIDELINES THE TYPICAL INSTALLATION FOR AN INTERCEPTOR |
| | MOUNTED ON THE FLOOR, INSTEAD OF UNDER THE FLOOR, IS TO |
| | PROVIDE A TRAP AND VENT PIPE FOR THE 3-COMPARTMENT SINK |
| | AND DIRECT PIPE CONNECTIONS IN AND OUT OF THE UNIT. |
| | SOME MANUFACTURER'S REQUIRE A FLOW CONTROL AIR INTAKE |
| | PIPE AND A VENT FOR THE DISCHARGE PIPE. PLEASE CONSULT |
| | THE MANUFACTURER'S GUIDELINES. IF THE INTERCEPTOR IS |
| | INSTALLED UNDER THE FLOOR TYPICALLY AN INDIRECT WASTE |
| | RECEPTOR WITH TRAP AND VENT SHALL BE PROVIDED FOR THE |
| | 3-COMPARTMENT WITH DIRECT FIXTURE DRAIN AND DISCHARGE |
| | PIPE CONNECTIONS. AS NOTE ABOVE MANUFACTURER'S |
| | GUIDELINES WILL ALSO APPLY. |
| | |
| | C) PROVIDE AN INDIVIDUAL AAV FOR THE HANDSINK FIXTURE |
| | DRAIN- TABLE 909.1 & SEC. 918.3 FBC P. |
| | |
| | 5) THE PRINTED NAME AND SIGNATURE OF THE CONTRACTOR |
| | SHALL BE ON THE DRAWINGS- SEC. 107.2.1 WPB. |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL/PLUMBING PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | [email protected] |
| | |