| 2023-03-23 14:48:28 | NEW COMMERCIAL BUILDING |
| | REVIEWED BY ROGER MCPHERSON |
| | 561-805-6716 |
| | [email protected] |
| | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| | AMENDMENT |
| | |
| | CORRECTIONS NEEDED - |
| | |
| | 1) PLEASE SHOW THE BUILDING SET BACKS FROM THE PROPERTY |
| | LINES - FBC WPB 107.2.5 |
| | |
| | 2) PLEASE SHOW THE STORM WATER FLOW AWAY FROM THE |
| | BUILDING AND AWAY FROM THE ADJACENT PROPERTY ON THE |
| | SITE PLAN OR PROVIDE A STORM WATER DRAINAGE PLAN - FBC |
| | WPB 107.2.5 |
| | |
| | 3) EXTERIOR DOORS - FBC 3202.2ENCROACHMENTS ABOVE GRADE |
| | AND BELOW 8 FEET IN HEIGHT. DOORS AND WINDOWS SHALL NOT |
| | OPEN OR PROJECT INTO THE PUBLIC RIGHT-OF-WAY. |
| | |
| | 4) FLOOR PLAN AND LIFE SAFETY PLAN - THE FIRE RATED |
| | ELEVATOR LOBBY AND CORRIDOR SEEMS NOT TO BE COMPLETE AT |
| | HALL (107), MAIL BOX ROOM (115) AND TRASH ROOM (104) |
| | ALONG WITH THE DOORS TO SUCH - PLEASE CLARIFY IF THE |
| | FIRE WALL IS TO BE CONTINUOUS. |
| | |
| | 5) DRAWING A.501 SHOWS THE HANDRAIL EXTENSIONS AT THE |
| | TOP LANDING TO TURN - HAND RAILS EXTENSIONS SHOULD NOT |
| | TURN UNLESS THE STAIR CONTINUES - FBC 1014.6 WHERE |
| | HANDRAILS ARE NOT CONTINUOUS BETWEEN FLIGHTS, THE |
| | HANDRAILS SHALL EXTEND HORIZONTALLY NOT LESS THAN 12 |
| | INCHES (305 MM) BEYOND THE TOP RISER AND CONTINUE TO |
| | SLOPE FOR THE DEPTH OF ONE TREAD BEYOND THE BOTTOM |
| | RISER. |
| | |
| | 6) DRAWING A.501 PLYWOOD SHOWN ON THE EXTERIOR WALL |
| | SHOULD BE SHOWN AS FIRE RETARDANT PER FBC 603.1 |
| | |
| | 7) PLEASE PROVIDE DETAILS FOR THE EXTERIOR WALL TILE |
| | CLADDING - ATTACHMENTS SIZE, TYPE AND ON CENTER |
| | SPACING, FRAMING ATTACHMENTS, WALL SHEATHING |
| | ATTACHMENTS ETC. - OR PROVIDE PRODUCT APPROVALS - |
| | EXTERIOR CLADDING IS SUBJECT TO WIND LOADS - FBC 1609.1 |
| | |
| | 8) PLEASE PROVIDE A SURVEY FBC WPB 107.1 |