| Date |
Text |
| 2023-02-24 15:02:01 | NEW SFR |
| | REVIEWED BY ROGER MCPHERSON |
| | 561-805-6716 |
| | [email protected] |
| | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| | AMENDMENT |
| | |
| | CORRECTIONS NEEDED - |
| | |
| | 1) PLEASE SHOW THE ATTIC ACCESS LOCATION AND SIZE - FBC |
| | R807.1 THE ROUGH-FRAMED OPENING SHALL BE NOT LESS THAN |
| | 22 INCHES BY 30 INCHES (559 MM BY 762 MM) AND SHALL BE |
| | LOCATED IN A HALLWAY OR OTHER LOCATION WITH READY |
| | ACCESS. |
| | |
| | 2) DRAFT STOP IS SHOWN IN THE ROOF TRUSSES - WHICH WILL |
| | REQUIRE 2 ATTIC ACCESS. DRAFT STOP IS NOT REQUIRED IN |
| | THE ATTIC. |
| | |
| | 3) PLEASE SHOW THE DRAFT STOP IN THE FLOOR TRUSSES PER |
| | - FBC R302.12 DRAFTSTOPPING. |
| | IN COMBUSTIBLE CONSTRUCTION WHERE THERE IS USABLE SPACE |
| | BOTH ABOVE AND BELOW THE CONCEALED SPACE OF A |
| | FLOOR-CEILING ASSEMBLY, DRAFTSTOPS SHALL BE INSTALLED |
| | SO THAT THE AREA OF THE CONCEALED SPACE DOES NOT EXCEED |
| | 1,000 SQUARE FEET (92.9 M2). DRAFTSTOPPING SHALL DIVIDE |
| | THE CONCEALED SPACE INTO APPROXIMATELY EQUAL AREAS. |
| | |
| | 4) PLEASE PROVIDE THE DOCUMENTATION (ICC EVALUATION |
| | REPORT) FOR THE ICYNENE FOAM INSULATION - FBC R316.3 |
| | |
| | 5) PRODUCT APPROVAL (NOA 20-0429.11) FOR THE SLIDING |
| | GLASS DOOR IS NOT ON THE LIST SHOWN ON THE WINDOW/DOOR |
| | SCHEDULE AND IS APPROVED FOR SMALL MISSILE IMPACT WHICH |
| | IS GLAZING ABOVE 30' ELEVATION - PLEASE PROVIDE THE |
| | SHUTTER PRODUCT APPROVAL FOR THIS SLIDING GLASS DOOR - |
| | FBC R301.2.1.2 |
| | |
| | 6) PRODUCT APPROVAL (FL16107-R13) FOR THE OVERHEAD |
| | GARAGE DOOR HAS A MAXIMUM WIDTH OF 9' - THE PROPOSED |
| | OVERHEAD GARAGE DOOR SHOWN ON THE DRAWING IS 16' - |
| | PLEASE PROVIDE A PRODUCT APPROVAL FOR THE 16' WIDE |
| | DOOR. PLEASE REVISE THE PRODUCT APPROVALS ON THE |
| | WINDOW/DOOR SCHEDULE. |
| | |
| | 7) PRODUCT APPROVAL (FL21138.12) FOR THE SWING DOOR HAS |
| | A MAXIMUM DESIGN PRESSURE OF (-50) PLEASE SHOW THE |
| | LOCATION FOR THESE DOORS - SOME OF THE EXTERIOR DOORS |
| | SHOWN ON THE WINDOW/DOOR SCHEDULE DRAWING SHOW THAT A |
| | HIGHER PRESSURE IS REQUIRED. |
| | |
| | 8) PLEASE DESCRIBE HOW THE ROOF COMPONENTS (TILE - |
| | UNDERLAYMENT) ARE ATTACHED OR CIRCLE THE ROOF SYSTEM |
| | ATTACHMENTS IN THE PRODUCT APPROVALS - IF USING |
| | ADHESIVE PLEASE PROVIDE THE ADHESIVE PRODUCT APPROVAL. |
| | FBC WPB 107.2.1.1 FOR ROOF ASSEMBLIES REQUIRED BY THE |
| | CODE, THE CONSTRUCTION DOCUMENTS SHALL ILLUSTRATE, |
| | DESCRIBE AND DELINEATE THE TYPE OF ROOFING SYSTEM, |
| | MATERIALS, FASTENING REQUIREMENTS, FLASHING |
| | REQUIREMENTS AND WIND RESISTANCE RATING THAT ARE |
| | REQUIRED TO BE INSTALLED. PRODUCT EVALUATION AND |
| | INSTALLATION SHALL INDICATE COMPLIANCE WITH THE WIND |
| | CRITERIA REQUIRED FOR THE SPECIFIC SITE OR A STATEMENT |
| | BY AN ARCHITECT OR ENGINEER CERTIFYING SUITABILITY FOR |
| | THE SPECIFIC SITE MUST BE SUBMITTED WITH THE |
| | CONSTRUCTION DOCUMENTS |