Plan Review Notes
Plan Review Notes For Permit 23020122
Permit Number 23020122
Review Stop G
Sequence Number 1
Notes
Date Text
2023-04-13 15:03:311ST REVIEW FBC-2020 FUEL GAS
 PERMIT- 23020122
 4/13/23
  
 CODES IN EFFECT:
 FBC FG- FLORIDA FUEL GAS CODE 7TH EDITION 2020
 FS- FLORIDA STATUTES
 FAC- FLORIDA ADMINISTRATIVE CODE
 WPB- WEST PALM BEACH AMENDMENTS TO THE FBC
  
 PLAN REVIEW RESULTS: DENIED.
  
 1) THE M PLANS ALL HAVE KEY PLANS SHOWING TWO AREAS OF
 WORK. TO HELP EXPEDITE THE REVIEW PLEASE LABEL THE
 ROOMS AND PLANS ACCORDING TO THE MECHANICAL SCHEDULES
 (M801 & M802) WHICH SHOW B-1&2 IN THE BOILER PLANT AND
 B-H-1 & 2 IN THE BOILER ROOM- SEC. 107.2.1 WPB. PLEASE
 NOTE THE BOILER LOCATIONS IN THE SAFETY RELIEF VALVE
 SCHEDULE DO NOT MATCH THE LOCATIONS IN THE EQUIPMENT
 SCHEDULES.
  
 2) M202: PLEASE PROVIDE A KEYNOTE WHICH SHOWS THE TYPES
 AND SIZES OF GAS PIPING SHOWN IN THE ENLARGED PLANS,
 AND PROVIDE A KEYNOTE WHICH REFERENCES THE LOCATION OF
 THE GAS TRAIN DETAIL. IT APPEARS TO BE DETAIL 6/M402.
 PLEASE PROVIDE THE SIZES OF GAS PIPING SHOWN IN THE
 DETAIL AND THE SYSTEM PRESSURES BEFORE AND AFTER THE
 REGULATORS (PRV'S)- SEC. 402.3 & 410.2 FBC FG. PLEASE
 NOTE A COMPLETE REVIEW CANNOT BE COMPLETED WITHOUT THE
 MBH OF B-1&2 WHICH IS NOT SHOWN LISTED IN THE SCHEDULE.
  
 3) M202: INDICATE HOW COMBUSTION AIR WILL BE PROVIDED
 FOR B-1&2 AND PROVIDE CALCULATIONS- SEC. 304.1 FBC FG.
 NOTE 14 INDICATES A NEW SUPPLY FAN SAF-1 ON THE ROOF
 ABOVE THE BOILER PLANT. IS THIS THE SOURCE OF THE
 COMBUSTION AIR? PLEASE PROVIDE FURTHER DETAILS.
  
 4) M202: PROVIDE A BOILER VENTING DIAGRAM THAT SHOWS
 THE TYPE AND SIZE OF VENT FLUE, AND VENT FLUE RUN
 LENGTH FROM BOILER OUTLET TO TERMINATION CAP ABOVE THE
 ROOF- SECS. 502.5, 503.1, & 631.2 FBC FG.
  
 5) M202: PLEASE SHOW THE CLEARANCE DISTANCE
 MEASUREMENTS FROM THE BOILER FLUE OUTLETS TO THE SAF-1
 INTAKE- SEC. 501.3.1. FBC M.
  
 6) M802 & M803: PLEASE SHOW IN THE SCHEDULE NOTES FOR
 THE BOILERS THAT THEY ARE LISTED IN ACCORDANCE WITH THE
 REQUIREMENTS OF ANSI Z21.13/CSA 4.9 OR UL 795- SEC.
 631.1 FBC FG.
  
 7) M203: PLEASE PROVIDE A KEYNOTE WHICH SHOWS THE TYPES
 AND SIZES OF GAS PIPING SHOWN IN THE ENLARGED PLANS FOR
 H-B-1 & H-B-2, AND PROVIDE A KEYNOTE WHICH REFERENCES
 THE LOCATION OF THE GAS TRAIN DETAIL. IT APPEARS TO BE
 DETAIL 4/M403. PLEASE PROVIDE THE SIZES OF GAS PIPING
 SHOWN IN THE DETAIL AND THE SYSTEM PRESSURES BEFORE AND
 AFTER THE REGULATORS (PRV'S)- SEC. 402.3 & 410.2 FBC
 FG.
  
 8) M203: PLEASE INCLUDE ROOF DEMOLITION AND RENOVATION
 PLANS FOR THE BOILER ROOM AS WERE PROVIDED FOR THE
 BOILER PLANT ROOM- SEC. 107.2.1 WPB.
  
 9) M203 INDICATE HOW COMBUSTION AIR WILL BE PROVIDED
 FOR H-B-1 & H-B-2 AND PROVIDE CALCULATIONS- SEC. 304.1
 FBC FG.
  
 10) M203: PROVIDE A BOILER VENTING DIAGRAM THAT SHOWS
 THE TYPE AND SIZE OF VENT FLUE, AND VENT FLUE RUN
 LENGTH FROM BOILER OUTLET TO TERMINATION CAP ABOVE THE
 ROOF- SECS. 502.5, 503.1, & 631.2 FBC FG.
  
 11) M802 & M803: PLEASE PROVIDE EQUIPMENT SCHEDULES FOR
 THE GAS REGULATORS- SEC. 410.2.
  
 12) M101: THE PLAN SHOWS AN EXISTING GAS LINE SUPPLYING
 A TEMPORARY STEAM BOILER. I WAS UNABLE TO LOCATE A
 PERMIT OR APPROVED PLANS FOR THE GAS PIPING AND
 TEMPORARY BOILER INSTALLATIONS. PLEASE PROVIDE COMPLETE
 PLANS AND DETAILS INCLUDING A GAS RISER DRAWING- SEC.
 107.3.5.1.5 FBC FG.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM.
  
 CHRISTOPHER L. COLE
 MECHANICAL/PLUMBING PLANS EXAMINER
 401 CLEMATIS STREET
 WEST PALM BEACH FL 33401
 561-805-6719
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved