| 2023-06-08 08:40:24 | A MINOR AMENDMENT IS IN REVIEW. AS STATED ON THE FSPR |
| | NO. 22-01 (Z22020019) APPROVAL LETTER, THE FOLLOWING |
| | ITEMS SHALL BE ADDRESSED DURING THE BUILDING PERMIT |
| | PROCESS, PLEASE SUBMIT WRITTEN RESPONSES TO EXPLAIN IF |
| | YOU HAVE OR WHEN YOU WILL ADDRESS THE ITEMS: |
| | |
| | 1. FINAL ACQUISITION OF THE 500 CLEMATIS STREET |
| | PROPERTY FROM THE CITY OF WEST PALM BEACH. |
| | |
| | 2. THE PROPERTY SHALL BE RE-PLATTED. |
| | |
| | 3. THE DEVELOPER SHALL BE RESPONSIBLE FOR ANY |
| | INFRASTRUCTURE IMPROVEMENTS REQUIRED TO SERVE THE |
| | PROJECT. |
| | |
| | 4. ALL STREETLIGHTS, TREE GRATES, BOLLARDS, PAVERS OR |
| | ANY OTHER STREETSCAPE ELEMENTS INSTALLED WITHIN THE |
| | CITY???S ROW BY THE PROJECT SHALL COMPLY WITH CITY???S |
| | STANDARDS AND SHALL BE APPROVED BY THE PLANNING |
| | DIVISION AND THE ENGINEERING SERVICES DEPARTMENT DURING |
| | THE BUILDING PERMIT PROCESS. ANY FEES ASSOCIATED WITH |
| | THE REMOVAL OF EXISTING STREETLIGHTS SHALL BE A COST TO |
| | THE DEVELOPER. |
| | |
| | 5. THE PROJECT IS REQUIRED TO COMPLY WITH THE ARTLIFE |
| | ORDINANCE, AND A PROPOSED LOCATION FOR THE ART ELEMENT |
| | SHALL BE INDICATED IN THE SITE PLAN. |
| | |
| | 6. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE |
| | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE |
| | STREET TREES, LANDSCAPING, IRRIGATION, LIGHTING AND |
| | HARDSCAPING WITHIN THE RIGHT OF WAY APPROVED WITH THIS |
| | PETITION. |
| | |
| | 7. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON |
| | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE |
| | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT |
| | SERVICES DEPARTMENT, PLANNING DIVISION. THE TREES AND |
| | PALMS ON SITE WILL BE REEVALUATED AT THE TIME OF |
| | PERMITTING TO DETERMINE THEIR CONDITION AND ANY |
| | MITIGATION DUE WILL BE CALCULATED. |
| | |
| | 8. THE APPLICANT SHALL PROVIDE IRRIGATION FOR THE |
| | ADJACENT QUADRILLE PLAZA DRIVE FROM THE PROJECT SITE. |
| | EXISTING IRRIGATION IS TO BE MODIFIED TO REMOVE THIS |
| | AREA FROM THE SYSTEM. THE APPLICANT WILL BE RESPONSIBLE |
| | FOR RELOCATING THE WATER METER AND BACKFLOW FROM THE |
| | SITE TO A LOCATION SPECIFIED BY THE CITY TO SERVICE THE |
| | REMAINING AREAS ON THE EAST SIDE OF THE ROAD. WATERING |
| | OF THE EXISTING STREET TREES SHALL BE MAINTAINED AT ALL |
| | TIMES DURING CONSTRUCTION. |
| | |
| | 9. FOR BUILDING PERMIT, THE SHEET L3.0 RENDERING SHALL |
| | BE REVISED TO MATCH THE LANDSCAPE PLAN. |
| | |
| | 10. FOR BUILDING PERMIT SUBMITTAL, SHEETS L2.1 AND L2.2 |
| | SHALL BE REVISED TO SHOW THE SQUARE FOOTAGE AND |
| | PERCENTAGE OF THE DESIGNATED TERRACE AREA THAT IS |
| | VEGETATED AREA TO MEET THE 20% 3 VEGETATED AREA. THE |
| | TOTAL PRIVATE OPEN SPACE SQUARE FOOTAGE REQUIRED, AND |
| | THE TOTAL PROVIDED SHALL BE SHOWN ON THE PLAN. |
| | |
| | 11. A MINIMUM OF 18 INCHES OF HORIZONTAL CLEARANCE |
| | SHALL BE PROVIDED BETWEEN THE BACKFLOW ASSEMBLIES AND |
| | ANY BUSHES. |
| | |
| | 13. ENGINEERING PERMIT SHALL BE OBTAINED BEFORE |
| | SUBMITTAL FOR BUILDING PERMIT. THE FOLLOWING ITEMS |
| | SHALL BE ADDRESSED DURING THE ENGINEERING PERMIT: |
| | A. THE WEST SIDE OF THE DRIVEWAY TO THE ALLEY DOES NOT |
| | APPEAR TO LINE UP WITH THE WALL OPENING. |
| | B. PROVIDE INFORMATION (RIM, INVERTS, BOTTOM |
| | ELEVATIONS) OF THE EXISTING CATCH BASIN THAT THE |
| | STORMWATER PIPE WILL CONNECT TO. |
| | C. SHOW AND PROVIDE INFORMATION (TYPE, SIZE, MATERIAL, |
| | ELEVATION) OF DRY UTILITIES IN THE ROW. |
| | |
| | 14. SIDEWALK SURFACES AND DRIVEWAYS WITHIN 10 FEET OF |
| | THE BUILDING FOUNDATION SHALL HAVE A MINIMUM OF 2% |
| | CROSS SLOPE DIRECTED AWAY FROM THE BUILDING. STORM |
| | WATER RUNOFF FROM THE SIDEWALK AND DRIVEWAY SHALL BE |
| | DIRECTED TO FLOW TO THE PROPERTY'S DRAINAGE SYSTEM OR |
| | TO THE STREET IF APPROVED BY THE CITY'S PUBLIC |
| | UTILITIES DIRECTOR OR DESIGNEE. |
| | |
| | 15. PROJECT SHALL INCREASE THE TOTAL NUMBER OF BIKE |
| | PARKING PROVIDED WITHIN THE PROJECT FROM 8 SPACES TO A |
| | MINIMUM OF 34 BIKE PARKING SPACES TO COMPLY WITH THE |
| | BIKE PARKING PROVISIONS FOR MICRO UNITS AND REGULAR |
| | UNITS (32 SPACES FOR MICROUNITS AND 2 FOR REGULAR |
| | UNITS). |
| | |
| | 16. PRIOR TO THE ISSUANCE OF THE FIRST BUILDING PERMIT, |
| | THE APPLICANT SHALL PREPARE A CONSTRUCTION SITE |
| | SECURITY AND MANAGEMENT PLAN FOR APPROVAL BY THE CITY |
| | OF WEST PALM BEACH POLICE DEPARTMENT CPTED OFFICIAL. |
| | |
| | 17. IN CASE OF PROPOSING ADDITION OF ANY NEW CAN(S) IN |
| | THE CITY`S RIGHT-OF-WAY , THE LOCATION AND QUANTITY OF |
| | THE CAN(S) SHALL BE REVIEWED AND APPROVED BY PUBLIC |
| | WORKS DEPARTMENT AND THE CAN(S) SHALL BE TYPE, SIZE AND |
| | COLOR APPROVED BY PUBLIC WORKS DEPARTMENT. THE BUILDING |
| | MAINTENANCE IS RESPONSIBLE TO MAINTAIN AND SERVICE THE |
| | CAN(S). |
| | |
| | 18. ALL THE PARKING STALL PAINTING SHALL COMPLY WITH |
| | THE CITY`S MUNICIPAL CODE SECTION 94-485 AND FLORIDA |
| | STATUES [553.5041 F.S.]. |
| | |
| | 19. SIGNAGE PLAN. ALL STRIPING AND SIGNAGE SHALL COMPLY |
| | WITH THE LATEST CITY OF WEST PALM BEACH STANDARD |
| | DETAILS AND MEET THE M.U.T.C.D. LATEST EDITION. |
| | |
| | 20. ALL PAVEMENT MARKING, SIGNING AND SIDEWALK DAMAGED |
| | DURING CONSTRUCTION SHALL BE RESTORED. 4 |
| | |
| | THE FOLLOWING ITEMS SHALL BE ADDRESSED PRIOR TO |
| | ISSUANCE OF FINAL CO: |
| | 21. PAVEMENT SHALL BE RESURFACED IN ACCORDANCE WITH |
| | CITY STANDARDS TO ANY AREA WHERE PAVEMENT MARKINGS ARE |
| | REMOVED, OR PAVEMENT HAS BEEN DAMAGED DURING |
| | CONSTRUCTION. |
| | |
| | 22. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE |
| | RESPONSIBLE FOR THE MAINTENANCE OF ANY HARDSCAPE, |
| | LANDSCAPING AND IRRIGATION, AND ANY OTHER DECORATIVE |
| | ELEMENT INSTALLED WITHIN THE RIGHT OF WAY BY THIS |
| | PROJECT. APPROVAL OF A MAINTENANCE AGREEMENT BETWEEN |
| | THE CITY AND THE APPLICANT, SUCCESSORS AND ASSIGNS WILL |
| | BE REQUIRED BEFORE FINAL CO. |
| | |
| | 23. PROJECT WILL BE REQUIRED TO CONTRIBUTE TO A TRANSIT |
| | FEE EQUAL TO $10/MONTH PER EACH MICRO UNIT INCLUDED IN |
| | THE PROJECT (TOTAL NUMBER OF MICRO UNITS PROPOSED). THE |
| | FIRST PAYMENT WILL BE DUE AT THE TIME OF FINAL CO. THE |
| | TRANSIT FEE CONTRIBUTION IS IN PERPETUITY OR FOR THE |
| | TIME THE MICRO UNITS EXIST. |
| | |
| | CLAUDIA D. IBAVEN |
| | CITY URBAN DESIGNER / ZONING AND PLANNING |
| | [email protected] |
| | 561-822-1402 |
| | |
| | |
| | |