| Date |
Text |
| 2023-03-14 08:36:52 | PETER E VALENTI |
| | BUILDING PLANS EXAMINER II/INSPECTOR |
| | [email protected] |
| | 561 805 6673 |
| | |
| | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) |
| | FBC B = FBC BUILDING |
| | FBC R = FBC RESIDENTIAL |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC EC = FBC ENERGY CONSERVATION |
| | FBC M = FBC MECHANICAL |
| | FBC FG = FBC FUEL GAS |
| | |
| | BUILDING REVIEW DENIED: |
| | |
| | FBC B 107.2.1 & WPB AMENDMENTS TO FBC B 107.2.1, THE |
| | INFORMATION THAT HAS BEEN SUBMITTED IS NOT CLEAR. |
| | PLEASE ADDRESS THE FOLLOWING: |
| | |
| | 1.) PROVIDE AN OVERALL FLOOR PLAN TO IDENTIFY WHERE |
| | EACH UNIT IS INRELATION TO EACH OTHER AND THAT SHOWS |
| | EXTERIOR WALLS AND INTERIOR TENANT SEPARATION WALLS. |
| | 2.) PROVIDE THE DETAILED INFORMATION FOR THE UNITS ONLY |
| | IDENTIFIED AS (EXAMPLE 12,000 BTUS). IF THESE A/C UNITS |
| | PLEASE IDENTIFY AS SUCH WITH ALL REQUIRED INFORMATION. |
| | IF THESE ARE SOMETHING ELSE, PLEASE CLARIFY. |
| | 3.) PROVIDE THE DETAILED INFORMATION FOR WHAT APPEARS |
| | TO BE WINDOW AND/OR DOOR OPENINGS. EACH OPENING WILL |
| | NEED TO SHOW THE TYPE OF OPENING SUCH AS SINGLE HUNG |
| | WINDOW, HORIZONTAL ROLLING WINDOW, OR SLIDING GLASS |
| | DOOR. PRODUCT APPROVALS/N.O.A.S ARE REQUIRED FOR EACH |
| | WINDOW AND/OR DOOR TO BE INSTALLED. |
| | 4.) PROVIDE THE DETAILS FOR THE NEW SHOWER WORK |
| | INCLUDING LOCATION OF SHOWER WALLS IN RELATION TO |
| | EXTERIOR AND INTERIOR SEPARATION WALLS. ALSO PROVIDE A |
| | WALL DETAIL SHOWING ALL MATERIAL TO BE USED INCLUDING |
| | INSULATION, FRAMING, DRYWALL, CEMENT BOARD, AND ANY |
| | FIRE RATING DETAILS. |
| | 5.) THE VALUATION DOES NOT APPEAR TO BE ACCURATE IN |
| | ACCORDANCE WITH THE ICC BUILDING VALUATION DATA |
| | CONSTRUCTION COST SCHEDULE AND THE MARSHALL / SWIFT |
| | VALUATIONS. PLEASE RE-EVALUATE THE COST OF THIS PROJECT |
| | AND PROVIDE A BREAKDOWN OF COSTS. |
| | 6.) THE CONTRACTOR ON APPLICATION APPEARS TO BE A |
| | PLUMBING CONTRACTOR. FOR THIS PROJECT, A MECHANICAL AND |
| | A GENERAL OR BUILDING CONTRACTOR WILL BE REQUIRED IN |
| | ADDITION TO PLUMBING CONTRACTOR. ADDITIONAL PERMITS |
| | AND/OR SUB-PERMITS WILL ALSO BE REQUIRED. |
| | 7.) EACH PLAN SHEET SUBMITTED NEEDS TO BE SIGNED BY THE |
| | PERSON RESPONSIBLE FOR THE DESIGN. |