| 2023-04-07 10:50:49 | PLAN REVIEW COMMENTS |
| | |
| | 1ST REVIEW: FBC SEVENTH EDITION (2020) |
| | ROBERT MCDOUGAL, CBO |
| | COMMERCIAL COMBINATION PLANS EXAMINER |
| | (561) 805-6714 |
| | [email protected] |
| | |
| | DENIED BY BUILDING |
| | PLEASE ADDRESS THE ITEMS NOTED BELOW: |
| | |
| | 1) THE PLANS SPECIFY THAT THE EXISTING FLOORING IN THE |
| | ENTIRE UNIT IS BEING REMOVED AND REPLACED WITH NEW |
| | CERAMIC TILE FLOORING. SPECIFY THE TOTAL SQUARE FOOTAGE |
| | OF NEW FLOORING, DESCRIPTION OF EXISTING SITE |
| | CONDITIONS: THICKNESS OF SLAB (B) FLOOR/CEILING |
| | ASSEMBLY BELOW (EXPOSED CONCRETE, SUSPENDED GYPSUM OR |
| | ACOUSTICAL AND THE TEST REPORTS FOR THE PROPOSED |
| | UNDERLAYMENT BASED ON THE EXISTING SITE CONDITIONS. THE |
| | TEST REPORTS SHALL BE BASED ON THE FOLLOWING ASTM'S: |
| | E-84, E-90 & E-492. |
| | |
| | 2) THE VALUATION ON YOUR APPLICATION IS LOW FOR THE |
| | PROPOSED SCOPE OF WORK. SUBMIT AN ITEMIZED COST |
| | BREAKDOWN. BUILDING PERMIT VALUATION. FOR PERMITTING |
| | PURPOSES, VALUATION OF FBC 109.3 BUILDINGS AND SYSTEMS |
| | SHALL BE TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, |
| | ELECTRIC, PLUMBING, MECHANICAL, INTERIOR FINISH, |
| | RELATIVE SITE WORK, ARCHITECTURAL AND DESIGN FEES, |
| | MARKETING COSTS, OVERHEAD AND PROFIT; EXCLUDING ONLY |
| | LAND VALUE. VALUATION REFERENCES MAY INCLUDE THE LATEST |
| | PUBLISHED DATA OF NATIONAL CONSTRUCTION COST ANALYSIS |
| | SERVICES (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY |
| | INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT |
| | VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. |
| | |
| | 3) THE FLOORING INSTALLATION DOES NOT FALL UNDER THE |
| | SCOPE ALLOWED BY A CFC LICENSE. YOU WILL NEED TO SUB |
| | OUT THE FLOORING WORK OR REMOVE IT FROM YOUR SCOPE OF |
| | WORK AND LET IT BE A SEPARATE PERMIT. |
| | |
| | 4) PLEASE SUBMIT A RESPONSE LETTER INDICATING HOW EACH |
| | OF THE REVIEW COMMENTS HAS BEEN ADDRESSED. |
| | |
| | |
| | |