| 2023-02-01 14:49:38 | CODES IN EFFECT: |
| | FBC = FLORIDA BUILDING CODE 2020 7TH EDITION |
| | WPB FBC = WEST PALM BEACH AMENDMENTS TO THE FBC 2017 |
| | 6TH ED, CHAPTER 1 |
| | WPB CCCM=WEST PALM BEACH CROSS-CONNECTION CONTROL |
| | MANUAL REVISED 2017 |
| | FBC EC = FLORIDA BUILDING CODE ENERGY CONSERVATION 2020 |
| | 7TH EDITION |
| | FBC ACC = FLORIDA ACCESSIBILITY CODE 2020 7TH EDITION |
| | FBC EX = FLORIDA EXISTING BUILDING CODE 2020 7TH |
| | EDITION |
| | FBC PL = FLORIDA PLUMBING CODE 2020 7TH EDITION |
| | FAC= FLORIDA ADMINISTRATIVE CODE |
| | FS = FLORIDA STATUTES |
| | |
| | 23010432 1501 N AUSTRALIAN AVE |
| | |
| | 1ST REVIEW |
| | |
| | PLUMBING COMMENTS: DENIED |
| | |
| | A SEPARATE PERMIT FOR INTERCEPTOR(S) AND BACKFLOW |
| | PREVENTER(S) AS APPLICABLE IS REQUIRED TO BE SUBMITTED |
| | PRIOR TO ISSUANCE OF THE PRIMARY PERMIT (AS |
| | APPLICABLE). YOU CAN SUBMIT AN APPLICATION "TBD" (TO BE |
| | DETERMINED) IF YOU DO NOT HAVE A CONTRACTOR SELECTED BY |
| | EMAILING A COMPLETED PERMIT APPLICATION TO |
| | [email protected] . YOU WILL RECEIVE INSTRUCTIONS |
| | TO PAY FEES AND UPLOAD PLANS. YOU MAY UPLOAD PLANS AND |
| | PAY FEES AT A FUTURE DATE, BUT THE APPLICATION IS |
| | REQUIRED AT THIS TIME. WE RECOMMEND THAT YOU PAY FEES |
| | AND UPLOAD PLANS AT THE SAME TIME. A SEPARATE PERMIT IS |
| | REQUIRED HOWEVER A REVIEW OF THE SYSTEM UNDER THE MAIN |
| | PERMIT IS ALSO REQUIRED. |
| | |
| | AFTER YOU HAVE THE PERMIT(S) GENERATED, PLEASE NOTIFY |
| | SAMANTHA HILL, CHIEF PLANS EXAMINER AT [email protected] |
| | AND RYAN BROWN, CHIEF PLUMBING INSPECTOR AT |
| | [email protected] VIA EMAIL WITH THE PERMIT NUMBER(S). |
| | |
| | PLUMBING COMMENTS: |
| | 1. A REVIEW OF MINIMUM PLUMBING FIXTURE REQUIREMENTS AS |
| | REQUIRED BY FBC ACC IS PART OF THE PLUMBING REVIEW |
| | PROCESS (SEE FBC PL 404.1) BUT IS TYPICALLY ADDRESSED |
| | ON THE ARCHITECTURAL PLANS. ANY COMMENTS CONCERNING |
| | THESE REQUIREMENTS MUST BE SATISFACTORILY ADDRESSED |
| | PRIOR TO A PLUMBING REVIEW APPROVAL. |
| | ***A) PLEASE SHOW THAT THE DRINKING FOUNTAINS COMPLY |
| | WITH FBC ACC 307.2 PROTRUDING OBJECTS. IF NECESSARY |
| | PROVIDE A CANE APRON FOR THE HIGHER LEVEL DRINKING |
| | FOUNTAIN TO COMPLY; NOTE IT ON THE PLUMBING FIXTURE |
| | SCHEDULE. |
| | ***B) ROOM 142/STAFF LOUNGE: SINK SHALL BE INSTALLED |
| | WITH THE FRONT OF THE HIGHER OF THE RIM OR COUNTER |
| | SURFACE 34 INCHES MAXIMUM ABOVE THE FINISH FLOOR OR |
| | GROUND. PROVIDE CLEAR FLOOR SPACE AND CABINET DETAIL; |
| | INCLUDE KNEE AND TOE CLEARANCE IF APPLICABLE. FBC ACC |
| | 212.3, 606.2, 606.3, 306.2, 306.3 |
| | |
| | 2. P1.0.0: PER WPB FBC 107.2.1, FBC PL CHAPTERS 6, 7, |
| | 9, 11, FBC EC FBC EC C404.4 (A-E) AND TABLE C403.2.10, |
| | PLEASE PROVIDE A NOTE STATING "SEE MEP SPECIFICATIONS |
| | 22 00 01 THROUGH 22 30 00 FOR PLUMBING SYSTEMS |
| | SPECIFICATIONS WHICH INCLUDES BUT IS NOT LIMITED TO |
| | DOMESTIC WATER, SANITARY, STORM, GAS AND PIPING |
| | INSULATION" |
| | |
| | 3. P1.4.0/WATER HEATER DETAIL GWH-1: |
| | ***A) ADD NOTE "MIXING VALVE SHALL COMPLY WITH ASSE |
| | 1017". FBC PL 613.1 |
| | ***B) PROVIDE ENERGY EFFICIENCY FOR WATER HEATER; |
| | COMPLY WITH FBC EC TABLE C404.2 |
| | |
| | |
| | 4. P1.4.0/WATER HEATER DETAIL EWH-1: |
| | ***A) PROVIDE A VACUUM RELIEF VALVE IN COLD WATER |
| | SUPPLY TO BOTTOM FED WATER HEATER. FBC PL 504.2 |
| | ***B) ADD NOTE "MIXING VALVE SHALL COMPLY WITH ASSE |
| | 1017". FBC PL 613.1 |
| | ***C) PROVIDE ENERGY EFFICIENCY FOR WATER HEATER; |
| | COMPLY WITH FBC EC TABLE C404.2 |
| | |
| | |
| | 5. REGARDING THE HOT WATER DISTRIBUTION PIPING: PLEASE |
| | REFER TO FBC EC C405.1 FOR THE MAXIMUM ALLOWABLE |
| | DEVELOPED PIPE LENGTH OF HOT WATER DISTRIBUTION FROM |
| | SOURCE TO FIXTURE. SOURCE AS DEFINED BY FBC PL 607.2 |
| | INCLUDES HOT WATER RECIRCULATING SYSTEM PIPING AND HEAT |
| | TRACED PIPING. P1.4.0/WATER HEATER DETAIL EWH-1 NOTES A |
| | RECIRCULATING SYSTEM; P1.4.0/WATER HEATER DETAIL GWH-1 |
| | DOES NOT. PLAN SHEETS P1.2.1, 1.3.2, 1.3.3 PLAN VIEW |
| | AND WATER RISERS DO NOT PROVIDE RECIRCULATING SYSTEMS. |
| | PLEASE PROVIDE SYSTEMS TO COMPLY. |
| | C404.5.1MAXIMUM ALLOWABLE PIPE LENGTH METHOD. |
| | THE MAXIMUM ALLOWABLE PIPING LENGTH FROM THE NEAREST |
| | SOURCE OF HEATED WATER TO THE TERMINATION OF THE |
| | FIXTURE SUPPLY PIPE SHALL BE IN ACCORDANCE WITH THE |
| | FOLLOWING. WHERE THE PIPING CONTAINS MORE THAN ONE SIZE |
| | OF PIPE, THE LARGEST SIZE OF PIPE WITHIN THE PIPING |
| | SHALL BE USED FOR DETERMINING THE MAXIMUM ALLOWABLE |
| | LENGTH OF THE PIPING IN TABLE C404.5.1. |
| | 1. 1.FOR A PUBLIC LAVATORY FAUCET, USE THE "PUBLIC |
| | LAVATORY FAUCETS" COLUMN IN TABLE C404.5.1. |
| | 2. 2.FOR ALL OTHER PLUMBING FIXTURES AND PLUMBING |
| | APPLIANCES, USE THE "OTHER FIXTURES AND APPLIANCES" |
| | COLUMN IN TABLE C404.5.1. |
| | |
| | |
| | |
| | 6. PROVIDE SCHEDULE AND SPECIFICATION FOR HOT WATER |
| | RECIRCULATING PUMP NOTED ON P1.4.0/WATER HEATER DETAIL |
| | EWH-1. |
| | |
| | |
| | 7. PLEASE PROVIDE WATER-TEMPERATURE LIMITING DEVICE |
| | THAT CONFORMS TO ASSE 1070 OR CSA B125.3 FOR LAVATORIES |
| | AND GROUP WASH FIXTURES LOCATED IN PUBLIC TOILET |
| | FACILITIES PROVIDED FOR CUSTOMERS, PATRONS AND |
| | VISITORS. FBC PL 419.5, 607.1.2 |
| | |
| | 8. PLEASE NOTE TRAP PRIMER LINE CONNECTION FOR ALL |
| | FLOOR DRAINS AND OTHER TRAPS IN NEED OF TRAP SEAL |
| | PROTECTION AS APPLICABLE. PROVIDE A NOTE REFERENCING |
| | MEP SPECIFICATION SECTION 22 30 00, PART 2.1, SUB PART |
| | 5(1); PROVIDE DETAIL OF TRAP PRIMER INSTALLATION. FBC |
| | PL 1002.4.1, 1002.4.1.1 THROUGH 1002.4.1.4 |
| | |
| | 9. KITCHEN/GREASE SYSTEM: PER WPB FBC |
| | 107.3.5.1.3(11)(13), PROVIDE THE FOLLOWING: |
| | ***A) PROVIDE RISER DIAGRAM OF GREASY WASTE. WPB FBC |
| | 107.3.5.1.3(6)(11)(13) |
| | ***B) PROVIDE CALCULATIONS FOR SIZING OF GREASE |
| | INTERCEPTOR. FBC PL 1003.3.5 THROUGH 1003.3.7 |
| | ***C) P1.2.0-PROVIDE DESCRIPTIONS FOR NOTED EQUIPMENT |
| | ITEMS 202, 204, 400, 402, 505 |
| | ***D) PROVIDE DETAILS FOR DISCHARGE OF NOTED EQUIPMENT |
| | ITEMS 202, 204, 400, 402, 505 TO GREASY WASTE SYSTEM. |
| | FBC PL SECTION 802 |
| | ***D) HAND SINKS AND ICE BINS SHALL NOT DISCHARGE TO |
| | THE GREASE INTERCEPTOR. FBC PL 1003.2 |
| | |
| | 10. SANITARY RISER DIAGRAMS SHALL IN ADDITION TO THE |
| | TWO PUBLIC GANG BATHS, REFLECT SANITARY DRAINAGE AND |
| | VENT FOR TOILET ROOMS 125 AND 127, STAFF TOILET ROOMS |
| | 139 AND 140, STAFF LOUNGE 142, LOBBY ROOM 100 (DRINKING |
| | FOUNTAIN TYPICAL), ROOMS 109 AND 117 FLOOR DRAINS AS |
| | WELL AS ANY KITCHEN ITEMS THAT SHOULD DISCHARGE TO |
| | SANITARY. IDENTIFY ALL SANITARY RISER DIAGRAMS WITH |
| | ROOM NUMBERS THAT CORRESPOND WITH THE FLOOR PLAN. WPB |
| | FBC 107.2.1, 107.3.5.1.3(4)(6)(13) |
| | |
| | 11. WATER RISER DIAGRAM PROVIDES MIXING VALVE AT GWH |
| | FOR 110 DEGREE HOT WATER DISTRIBUTION TO PLUMBING |
| | FIXTURES. 140 DEGREE WATER IS SUPPLIED DIRECTLY TO THE |
| | KITCHEN EQUIPMENT. FBC PL 607.1.1 STIPULATES A |
| | THERMOSTAT CONTROL FOR A WATER HEATER SHALL NOT SERVE |
| | AS THE TEMPERATURE LIMITING MEANS FOR THE PURPOSES OF |
| | COMPLYING WITH THE REQUIREMENTS OF THIS CODE FOR |
| | MAXIMUM ALLOWABLE HOT OR TEMPERED WATER DELIVERY |
| | TEMPERATURE AT FIXTURES AND FBC PL 613.1 STATES |
| | TEMPERATURE-ACTUATED MIXING VALVES, WHICH ARE INSTALLED |
| | TO REDUCE WATER TEMPERATURES TO DEFINED LIMITS, SHALL |
| | COMPLY WITH ASSE 1017. SUCH VALVES SHALL BE INSTALLED |
| | AT THE HOT WATER SOURCE. |
| | THIS DOES NOT ELIMINATE THE REQUIREMENT FOR |
| | WATER-TEMPERATURE LIMITING DEVICES THAT CONFORM TO ASSE |
| | 1070 OR CSA B125.3 FOR LAVATORIES AND GROUP WASH |
| | FIXTURES LOCATED IN PUBLIC TOILET FACILITIES AS |
| | REQUIRED BY FBC PL 419.5, 607.1.2. |
| | |
| | 12. PLEASE RECONCILE WATER HEATER DETAILS ON P4.1.0 AND |
| | RISER DIAGRAMS. WPB FBC 107.2.1, 107.3.5.1.3(3)(5)(13) |
| | |
| | 13. IDENTIFY ALL WATER RISER DIAGRAMS WITH ROOM NUMBERS |
| | THAT CORRESPOND WITH THE FLOOR PLAN. WPB FBC 107.2.1, |
| | 107.3.5.1.3(3)(13) |
| | |
| | 14. IDENTIFY KITCHEN EQUIPMENT ITEMS 202, 204, 400, |
| | 400.1, 401, 402, 500, 505, 506 ON WATER RISER DIAGRAM |
| | (WPB FBC 107.2.1, 107.3.5.1.3). |
| | IF WATER IS CONNECTED TO ANY EQUIPMENT THAT PRESENTS A |
| | BACKFLOW/CROSS CONNECTION HAZARD TO THE POTABLE WATER |
| | SUPPLY, SPECIFY AND PROVIDE A BACKFLOW PREVENTER. FBC |
| | PL 608.3 |
| | |
| | 15. P1.2.1: PROVIDE DESCRIPTIONS FOR NOTED EQUIPMENT |
| | ITEMS 202, 204, 400, 400.1, 401, 402, 500, 505, 506. |
| | IF WATER IS CONNECTED TO ANY EQUIPMENT THAT PRESENTS A |
| | BACKFLOW/CROSS CONNECTION HAZARD TO THE POTABLE WATER |
| | SUPPLY, SPECIFY AND PROVIDE A BACKFLOW PREVENTER. FBC |
| | PL 608.3 |
| | |
| | 16. PROVIDE CALCULATIONS FOR SIZING OF WATER |
| | DISTRIBUTION. FBC PL 604.1 |
| | |
| | 17. PROVIDE CALCULATIONS FOR SIZING OF STORM WATER |
| | PIPING SYSTEM. CALCULATIONS SHALL INCLUDE IN ADDITION |
| | TO NOTED GPM, 100-YEAR HOURLY RAINFALL RATE, SLOPE, |
| | SQUARE FOOTAGE INCLUDING 1/2 OF VERTICAL SQUARE FOOTAGE |
| | AND RUNOFF FROM UPPER ROOF/INTERNAL GUTTER AND |
| | DOWNSPOUT SYSTEM. FBC PL 1106.1, 1106.2, 1106.3, |
| | 1106.4, 1106.5, 1106.6 |
| | |
| | END OF COMMENTS. |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT |
| | CORRECTED PAGES INTO TO SUBMITTAL AND REMOVE OR VOID |
| | THE PREVIOUSLY REVIEWED SHEETS. ALL PLANS TO BE SIGNED |
| | AND SEALED BY THE DESIGNER AS REQUIRED BY FAC AND FS. |
| | |
| | |
| | |
| | JERALD SMITH |
| | PLUMBING PLANS EXAMINER PX928 |
| | PLUMBING INSPECTOR BN2148 |
| | CITY OF WEST PALM BEACH |
| | PLEASE CONTACT RYAN BROWN WITH ANY QUESTIONS |
| | [email protected] |
| | 561-805-6692 |
| | |