| Plan Review Notes For Permit 23010259 |
| Permit Number |
23010259 |
|
| Review Stop |
B |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2023-01-11 11:03:33 | REVISION | | | REVIEWED BY ROGER MCPHERSON | | | 561-805-6716 | | | [email protected] | | | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 | | | AMENDMENT | | | | | | CORRECTIONS NEEDED - | | | | | | 1) PLEASE SHOW THE REQUIRED HOURLY FIRE RATING FOR THE | | | ADDED STEEL COLUMNS AND BEAM - FBC 601 | | | | | | 2) ROOF TOP EQUIPMENT STANDS AND DUCT - PLEASE SHOW THE | | | CLEARANCE FROM THE TOP OF THE ROOFING TO THE BOTTOM OF | | | THE ROOF TOP EQUIPMENT STAND AND DUCT - FBC 1510.10 | | | | | | 3) PLEASE SHOW IF TERMITE PROTECTION IS REQUIRED AT THE | | | NEW FOUNDATION - FBC 1816.1.2 | | | IF SOIL TREATMENT IS USED FOR SUBTERRANEAN TERMITE | | | PREVENTION, SOIL AREA DISTURBED AFTER INITIAL CHEMICAL | | | SOIL TREATMENT SHALL BE RETREATED WITH A CHEMICAL SOIL | | | TREATMENT, INCLUDING SPACES BOXED OR FORMED. |
|