| Date |
Text |
| 2023-02-01 11:08:52 | WEST PALM BEACH DEVELOPMENT SERVICES-CONSTRUCTION |
| | SERVICES/ BUILDING DIVISION |
| | 2020 FBC- BUILDING PLAN REVIEW |
| | W. P. B. PERMIT: 22120993 GROUND IMPROVEMENT |
| | W.P.B. MASTER: 22129889 MASTER 27 STORY |
| | ADD: 1919 N FLAGLER DR. |
| | CONT: TBD/ TO BE DETERMINED |
| | TEL: |
| | E-MAIL: [email protected] |
| | |
| | 2020 FLORIDA BUILDING CODE W 2020 WEST PALM BEACH |
| | AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1, |
| | ADMINISTRATION |
| | |
| | 2020 EXISTING BUILDING CODE. 801.3 COMPLIANCE. ALL NEW |
| | CONSTRUCTION ELEMENTS, COMPONENTS, SYSTEMS, AND SPACES |
| | SHALL COMPLY WITH THE REQUIREMENTS OF THE FLORIDA |
| | BUILDING CODE, BUILDING. |
| | |
| | 1ST REVIEW |
| | DATE: WED. FEB. 01ST/ 2023 |
| | ACTION: DENIED |
| | |
| | 1) THERE ARE 9-11 LOTS THAT NEED TO BE REPLATED AND |
| | RECEIVE A NEW PARCEL CONTROL NUMBER. |
| | |
| | 2) SOILS REPORT ADDENDUM TO GEOTECHNICAL ENGINEERING |
| | STUDY OLARA 1919 N FLAGLER LANGAN PROJECT NO 300301501. |
| | THIS REPORT STILL SEEMS TO BE A PRELIMINARY STUDY FOR |
| | THE DESIGN TEAM AND OWNERS TO DECIDE WHICH OPTIONS ARE |
| | TO BE CONSIDERED FOR STRENGTHENING OF THE SOILS. THE |
| | OTHER ISSUE THAT NEEDS TO BE DETERMINED IS THE |
| | SPECIALTY CONTRACTOR AND METHODS THEY WILL USE FOR SOIL |
| | DENSIFICATION. THE ENGINEERING REPORT ALSO REFERS TO |
| | THE POTENTIAL PRESENCE OF OBSTRUCTIONS BASED ON |
| | PREVIOUS DEVELOPMENT AND STRUCTURES, IN PLANNING THE |
| | EXECUTION OF GROUND DEVELOPMENT. THE SPECIALTY |
| | CONTRACTOR SHOULD SUBMIT DETAILED DESIGN CALCULATIONS |
| | AND SHOP DRAWINGS INDICATING THE LOCATION OF ALL |
| | PROPOSED DENSIFICATION PROBES, ASSUMPTIONS, SOILS |
| | PARAMETERS, ETC. NO SOILS CONTRACTOR HAS SIGNED ONTO |
| | THIS PERMIT NOR SUBMITTED DETAILED DESIGN CALCULATIONS |
| | AND SHOP DRAWINGS INDICATING THE LOCATION OF ALL |
| | PROPOSED DENSIFICATION PROBES, ASSUMPTIONS, SOILS |
| | PARAMETERS, ETC. |
| | 2020 WEST PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING |
| | CODE, CHAPTER 1, ADMINISTRATION 107.2.1. CONSTRUCTION |
| | DOCUMENTS SHALL BE SUFFICIENT CLARITY TO INDICATE THE |
| | LOCATION, NATURE AND EXTENT OF THE WORK PROPOSED AND |
| | SHOW IN DETAIL THAT IT WILL CONFORM TO THE PROVISIONS |
| | OF THIS CODE AND RELEVANT LAWS, ORDINANCES, RULES AND |
| | REGULATIONS, AS DETERMINED BY THE BUILDING OFFICIAL. |
| | |
| | 3) SHEET 001 THE GROUND IMPROVEMENT PLAN SHOWS AREAS |
| | WHERE GROUND IMPROVEMENT IS TO OCCUR BUT THERE ARE |
| | BUILDINGS STANDING IN SOME OF THE AREAS. WHERE THE |
| | STRUCTURES STILL STAND ARE THE STRUCTURES TO BE |
| | DEMOLISHED AND FURTHER GROUND IMPROVEMENT TO OCCUR IN |
| | THESE AREAS LATER? ADDITIONAL INFORMATION IS REQUIRED. |
| | 107.2.1.2. |
| | |
| | 4) A TRANSMITTAL LETTER / NARRATIVE LISTING THE |
| | ORIGINAL REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF |
| | THE REVISION MADE, IDENTIFYING THE SHEET OR |
| | SPECIFICATION PAGE WHERE THE CHANGES CAN BE FOUND WILL |
| | HELP TO EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR |
| | ANTICIPATED COOPERATION. |
| | |
| | PLEASE NOTE WITH THE LACK OF INFORMATION FOR THIS |
| | REVIEW, SUBSEQUENT REMARKS MAYBE MADE IN THE NEXT |
| | REVIEW CYCLE. |
| | PLEASE NOTE WITH THE LACK OF INFORMATION FOR THIS |
| | REVIEW, SUBSEQUENT |
| | REMARKS MAYBE MADE IN THE NEXT REVIEW CYCLE. |
| | |
| | |
| | MY WORK HOURS ARE USUALLY TUES. & WED. 7:30 AM- 4:30 PM |
| | PART-TIME/ SEMI-RETIRED. |
| | |
| | IF YOU WISH TO SPEAK WITH A PLANS EXAMINER BEFORE I GET |
| | BACK INTO THE OFFICE CALL |
| | (561)805-6700 AND ASK FOR THE PLANS EXAMINER ON-CALL. |
| | THANK YOU. |
| | |
| | JAMES A. WITMER BN, PX, SFP, CBO |
| | SENIOR COMMERCIAL COMBINATION PLANS EXAMINER |
| | CONSTRUCTION SERVICES DIVISION / DEVELOPMENT SERVICES |
| | DEPARTMENT |
| | 401 CLEMATIS ST. WEST PALM BEACH. FL 33402 |
| | TEL: 561-805-6717 |
| | FAX: 561-805-6676 |
| | E-MAIL: [email protected] |
| | |
| | |
| | |
| | |