| 2023-02-27 09:27:11 | NEW SFR |
| | REVIEWED BY ROGER MCPHERSON |
| | 561-805-6716 |
| | [email protected] |
| | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| | AMENDMENT |
| | |
| | CORRECTIONS NEEDED - |
| | |
| | 1) PLEASE SHOW THE STORM WATER FLOW AWAY FROM THE |
| | BUILDING AND AWAY FROM THE ADJACENT PROPERTY ON THE |
| | SITE PLAN OR PROVIDE A STORM WATER PLAN - FBC WPB |
| | 107.2.5 SITE PLAN. THE CONSTRUCTION DOCUMENTS SUBMITTED |
| | WITH THE APPLICATION FOR PERMIT SHALL BE ACCOMPANIED BY |
| | A SITE PLAN SHOWING TO SCALE THE SIZE AND LOCATION OF |
| | NEW CONSTRUCTION AND EXISTING STRUCTURES ON THE SITE, |
| | DISTANCES FROM LOT LINES, THE ESTABLISHED STREET GRADES |
| | AND THE PROPOSED FINISHED GRADES, DEPICTING THE |
| | PROPOSED LOT DRAINAGE AND, AS APPLICABLE, FLOOD HAZARD |
| | AREAS, FLOODWAYS, AND DESIGN FLOOD ELEVATIONS; AND IT |
| | SHALL BE DRAWN IN ACCORDANCE WITH AN ACCURATE AND |
| | INCLUDED ON A BOUNDARY LINE SURVEY. (PLEASE PROVIDE CUT |
| | SECTIONS FOR ANY PROPOSED WATER RETAINING SWALES) |
| | |
| | 2) PLEASE PROVIDE A ROOFING SYSTEM PRODUCT APPROVAL - |
| | IN THE PRODUCT APPROVAL FOR THE FLAT DECK - PLEASE |
| | CIRCLE THE ROOFING SYSTEM TO BE USED IN THE ROOFING |
| | PRODUCT APPROVAL - ROOFING SYSTEM TO BE USED ON THE |
| | PROVIDED PRODUCT APPROVAL MAY REQUIRE ADDITIONAL SIGNED |
| | AND SEALED ATTACHMENT DETAILS FROM AN ARCHITECT OR |
| | ENGINEER FOR ROOF WIND ZONES 2 AND 3 WHICH REQUIRE A |
| | HIGHER PRESSURE THAN THE MAXIMUM SHOWN ON THE PRODUCT |
| | APPROVAL - SEE GENERAL LIMITATION NOTES ON THE PRODUCT |
| | APPROVAL. |
| | |
| | 3) PLEASE SHOW EXTERIOR WALL CLADDING ATTACHMENT OR |
| | PROVIDE A PRODUCT APPROVAL - FBC WPB 107.2.1 |
| | |
| | 4) PLEASE SHOW ROOF SHEATHING/ STEEL DECKING |
| | ATTACHMENTS - FBC WPB 107.2.1 |
| | |
| | 5) A SEPARATE PERMIT IS REQUIRED FOR THE ACCESSORY |
| | STRUCTURE. |
| | |
| | 6) THE SURVEY, DRAWING G-1 AND ALL OF THE STRUCTURAL |
| | DRAWINGS DO NOT SHOW AS DIGITALLY SIGNED IN ADOBE |
| | READER - SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED |
| | TO BE DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN |
| | ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL |
| | SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A |
| | SPECIFIC TYPE OF E-SIGNATURE). |