| 2022-12-09 14:06:59 | 1ST REVIEW FBC-2020 PLUMBING |
| | PERMIT- 22111270 |
| | |
| | CODES IN EFFECT: |
| | FBC P- FLORIDA PLUMBING CODE 7TH EDITION 2020 |
| | FBC ACC- FLORIDA ACCESSIBILITY CODE 7TH EDITION 2020 |
| | FBC EX- FLORIDA EXISTING BUILDING CODE 7TH EDITION 2020 |
| | FS- FLORIDA STATUTES |
| | FAC- FLORIDA ADMINISTRATIVE CODE |
| | WPB- WEST PALM BEACH AMENDMENTS TO THE FBC |
| | |
| | PLAN REVIEW RESULTS: DENIED. |
| | |
| | 1) SHEETS A.101 & A.502: THE DRAWINGS SHOW AN ELEVATOR |
| | SUMP PIT. ASSUMING THE PIT IS FOR A HYDRAULIC ELEVATOR |
| | PLEASE DETAIL THE SUMP PUMP INSTALLATION INCLUDING SUMP |
| | PIT DIMENSIONS AND PUMP PIPING CONNECTIONS AND DRAINAGE |
| | DISCHARGE LOCATION- SECS. 712.3- 712.3.5 FBC P. PLEASE |
| | INCLUDE AN EQUIPMENT SCHEDULE FOR THE PUMP AND NOTE AN |
| | OIL INTERCEPTOR IS REQUIRED FOR THE PUMP DRAINAGE |
| | SYSTEM UNLESS THE PUMP IS EQUIPPED WITH AN APPROVED |
| | ALARM SYSTEM- SEC. 1003.4 FBC P. |
| | |
| | 2) A.102: PROVIDE SANITARY AND WATER RISER DRAWINGS FOR |
| | INSTALLATION OF THE NEW MOP SINK- SEC. 107.3.5.1.3 FBC |
| | P. PLEASE INCLUDE A LAYOUT PLAN THAT SHOWS THE LOCATION |
| | OF THE NEW DRAIN LINE CONNECTION TO THE EXISTING |
| | BUILDING DRAIN. |
| | |
| | 3) A.102: SHOW THE SOURCE OF THE HOT WATER FOR THE MOP |
| | SINK- SEC. 607.1 FBC P. IF A NEW WATER HEATER IS |
| | PROPOSED PLEASE SHOW THE LOCATION AND PROVIDE THE |
| | FOLLOWING INFORMATION: |
| | A) EQUIPMENT SCHEDULE. |
| | B) PROVIDE A SCHEMATIC DRAWING THAT SHOWS PIPING |
| | CONNECTIONS INCLUDING THE COLD WATER FEED, CHECK VALVE, |
| | HOT WATER SUPPLY, THERMAL EXPANSION CONTROL, HOT WATER |
| | RECIRCULATION PUMP (IF INSTALLED), AND MASTER |
| | THERMOSTATIC MIXING VALVE- SECS. 607.1.1, 607.2.2, |
| | 607.3 FBC P. |
| | C) PROVIDE RELIEF VALVE PIPING DETAILS INCLUDING TYPE |
| | AND SIZE OF RELIEF PIPE AND DISCHARGE LOCATION; PAN AND |
| | PAN DRAIN DETAILS, PAN DRAIN RUN AND TERMINATION |
| | LOCATION- SECS. 504.4- 504.7.2 FBC P. |
| | |
| | 4) A.301 PROVIDE ROOF DRAINAGE CALCULATIONS INCLUDING |
| | THE RAIN FALL RATE, DRAINAGE SQUARE FOOTAGE INCLUDING |
| | PARAPET WALLS, TOTAL GPM FLOW, AND GPM FLOW AT EACH |
| | PRIMARY AND SECONDARY DRAIN LOCATION- SEC. 1106.1 & |
| | 1106.2 FBC P. |
| | A) PROVIDE A STORM DRAIN ISOMETRIC DRAWING SHOWING |
| | VERTICAL LEADER AND HORIZONTAL DRAIN SIZES, AND |
| | DISCHARGE LOCATIONS- SEC. 1101.2, 1106.1, 1106.2 & |
| | 1106.3 FBC P. |
| | B) SHOW THE DIMENSIONS OF THE NEW SCUPPER REPLACEMENTS- |
| | SEC. 1106.5 & 1108.3 FBC P. |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL/PLUMBING PLANS EXAMINER |
| | 401 CLEMATIS STREET |
| | WEST PALM BEACH FL 33401 |
| | 561-805-6719 |
| | [email protected] |
| | |