| Date |
Text |
| 2023-01-25 12:13:41 | 2ND BUILDING REVIEW |
| | RESULTS: CORRECTIONS NEEDED |
| | |
| | CHRISTOPHER S. THROOP, CBO, BN, PX, CFM |
| | PLANS EXAMINER II |
| | CITY OF WEST PALM BEACH |
| | (561) 805-6726 |
| | [email protected] |
| | |
| | CODES IN EFFECT: |
| | 2020 FLORIDA BUILDING CODE, 7TH EDITION W/2017 WEST |
| | PALM BEACH AMENDMENTS TO THE FLORIDA BUILDING CODE, |
| | CHAPTER 1 ADMINISTRATION |
| | NFPA 70 2017 EDITION NEC 2017 |
| | |
| | ADDRESS THE FOLLOWING COMMENTS AND RE-SUBMIT: |
| | |
| | NOTICE: |
| | PREVIOUS COMMENTS THAT HAVE BEEN ADDRESSED |
| | SATISFACTORILY ARE MARKED AS CORRECTED OR REMOVED. |
| | PREVIOUS COMMENTS THAT HAVE NOT BEEN ADDRESSED |
| | SATISFACTORILY MAY HAVE ADDITIONAL COMMENTS IN |
| | PARENTHESES. ANY NEW COMMENT WILL BE LISTED AFTER |
| | PREVIOUS COMMENTS. |
| | |
| | 1.PROVIDE THE FL PRODUCT APPROVALS FOR THE PROPOSED |
| | (OVERHEAD DOORS) |
| | FL PRODUCT APPROVALS SHALL INCLUDE THE COVER SHEETS, |
| | EVALUATION REPORT AND INSTALLATIONS INSTRUCTIONS. |
| | NOTE: NOAS DO NOT HAVE COVER SHEETS. |
| | FBC 107.3.4 PROVIDE PRODUCT APPROVALS FOR THOSE |
| | PRODUCTS WHICH ARE REGULATED BY FAC RULE 9N-3 REVIEWED |
| | AND APPROVED IN WRITING BY THE DESIGNER OF RECORD. |
| | |
| | NEW COMMENTS: |
| | |
| | 2.PROVIDE A ROOF FRAMING PLAN. |
| | 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS |
| | SHALL BE IN ACCORDANCE WITH SECTIONS107.2.1 THROUGH |
| | 107.2.5. |
| | |
| | 3.PROVIDE THE DESIGN PRESSURES FOR NEW ROOFING PER |
| | FIGURE R301.2(7) COMPONENT AND CLADDING PRESSURE ZONES |
| | R301.2.1.1WIND DESIGN REQUIRED. |
| | |
| | 4.PROVIDE A ROOF SHEATHING FASTENER SCHEDULE PER THE |
| | ENHANCED CALCULATED DESIGN PRESSURES OF ZONES 2 AND 3. |
| | TABLE R301.2.1.2 WINDBORNE DEBRIS PROTECTION FASTENING |
| | SCHEDULE FOR WOOD STRUCTURAL PANELS. |
| | |
| | 5.PROVIDE ROOF DRAINAGE PLAN |
| | R903.4ROOF DRAINAGE. |
| | UNLESS ROOFS ARE SLOPED TO DRAIN OVER ROOF EDGES, ROOF |
| | DRAINS SHALL BE INSTALLED AT EACH LOW POINT OF THE |
| | ROOF. WHERE REQUIRED FOR ROOF DRAINAGE, SCUPPERS SHALL |
| | BE PLACED LEVEL WITH THE ROOF SURFACE IN A WALL OR |
| | PARAPET. THE SCUPPER SHALL BE LOCATED AS DETERMINED BY |
| | THE ROOF SLOPE AND CONTRIBUTING ROOF AREA. |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | |
| | WHEN RESUBMITING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY |
| | RE-SUBMITTAL FORM. |
| | |