| 2022-11-14 13:59:53 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE |
| | MARSHAL, WITH THE FOLLOWING COMMENTS: |
| | |
| | 1) THERE IS AN INDICATION ON THE PERMIT APPLICATION |
| | OFSOUND PROOFT FOR NEW FLOORING; HOWEVER, THERE IS NO |
| | INDICATION OF THE NEW FLOOR PRODUCT/MATERIAL. |
| | |
| | FFLOORING IS MANUFACTURED AROUND THE WORLD AND NOT ALL |
| | ARE TESTED AND MEETING LISTED AND NFPA STANDARDS. |
| | |
| | PER NFPA 101, CH 30 |
| | |
| | 30.3.3.3 INTERIOR FLOOR FINISH. |
| | 30.3.3.1 GENERAL. INTERIOR FINISH SHALL BE IN |
| | ACCORDANCE WITH |
| | SECTION 10.2. |
| | |
| | 10.2.7.2* FLOOR COVERINGS, OTHER THAN CARPET FOR WHICH |
| | 10.2.2.2 |
| | ESTABLISHES REQUIREMENTS FOR FIRE PERFORMANCE, SHALL |
| | HAVE A |
| | MINIMUM CRITICAL RADIANT FLUX OF 0.1 W/CM2. |
| | |
| | FOR THE OFFICIAL RECORD, PLEASE PROVIDE THE FLOORING |
| | PRODUCT NAME AND THE PRODUCT SPEC SHEETS OF THE |
| | PROPOSED NEW FLOORING INDICATING THE FIRE BEHAVIOR |
| | RATING. |
| | |
| | IF THE PROPOSED FLOORING IS PORCELAIN/CERAMIC TILE, |
| | NATURAL STONE TILE, CONCRETE TILES, PRODUCT SPEC SHEETS |
| | WOULD NOT BE REQUIRED. |
| | |
| | PRODUCT SPEC SHEETS ARE REQUIRED FOR LVT, VINYL |
| | FLOORING, WOOD/VINYL LAMINATES, ETC. |
| | |
| | |
| | 2) THERE IS A FLOOR PLAN SUBMITTED; HOWEVER, THERE IS |
| | NO INDICATION OF THE AREAS OF THE NEW FLOOR. |
| | |
| | FOR THE OFFICIAL RECORD PLEASE INDIOCATE WHERE THE NEW |
| | FLOORING WILL BE LOCATED. |
| | |
| | |
| | |
| | 3) WHEN RESUBMITTING, PLEASE PROVIDE PLAN SHEET |
| | REVISION CLOUDS OR NUMBERED NARRATIVE RESPONSES TO THE |
| | ABOVE. |
| | |
| | |
| | 4) ADDITIONAL COMMENTS MAY BE PROVIDED ON THE |
| | RE-SUBMITTAL OF THE ABOVE. |
| | |
| | |
| | PETER LEDUC |
| | FIRE MARSHAL |
| | 561-804-4709 |
| | [email protected] |
| | |