| 2022-10-19 12:37:56 | CALL OUT MIN. 3 FT. SETBACK FROM EDGE OF PROPOSED |
| | DRIVEWAY TO PROPERTY LINE. SHOW ANY WATER METERS, |
| | SANITARY CLEANOUTS, STORM INLETS ETC. IN VICINITY OF |
| | PROPOSED DRIVEWAY. DO NOT CONSTRUCT DRIVEWAY ON TOP OF |
| | WATER METERS, SANITARY CLEANOUTS, STORMWATER INLETS |
| | ETC. |
| | |
| | CONSTRUCT DRIVEWAY APRON IN COMPLIANCE WITH WPB |
| | CONSTRUCTION STANDARD DETAIL GC-5 (WHEN DISTANCE |
| | BETWEEN CURB OR EDGE OF PAVEMENT IS 10 FT. OR GREATER), |
| | OR STANDARD DETAIL GC-6 (WHEN DISTANCE BETWEEN CURB OR |
| | EDGE OF PAVEMENT IS LESS THAN 10 FT.) CITY STANDARD |
| | DETAIL IS REQUIRED, SEE LINK BELOW: HTTPS://WWW.WPB.ORG |
| | /GOVERNMENT/ENGINEERING/ENGINEERING-STANDARDS-DETAILS |
| | |
| | SHOW WIDTHS OF PROPOSED DRIVEWAY APRONS. MAXIMUM |
| | DRIVEWAY WIDTHS AT RIGHT OF WAY SHALL NOT EXCEED 20 FT. |
| | (OR TWO 10 FT. APRONS) PLUS TWO 3 FT. FLARES ON EACH |
| | DRIVEWAY. |
| | |
| | CONSTRUCT DRIVEWAY APRON IN COMPLIANCE WITH WPB |
| | CONSTRUCTION STANDARD DETAIL GC-5 (WHEN DISTANCE |
| | BETWEEN CURB OR EDGE OF PAVEMENT IS 10 FT. OR GREATER), |
| | OR STANDARD DETAIL GC-6 (WHEN DISTANCE BETWEEN CURB OR |
| | EDGE OF PAVEMENT IS LESS THAN 10 FT.) CITY STANDARD |
| | DETAIL IS REQUIRED, SEE LINK BELOW: HTTPS://WWW.WPB.ORG |
| | /GOVERNMENT/ENGINEERING/ENGINEERING-STANDARDS-DETAILS |
| | |
| | THANKS, |
| | RICK ROSSANO, SENIOR PROJECT COORD., WPB ENG. SERVICES |
| | DEPT., 561-494-1098, FAX: 561-494-1116 [email protected] |
| | FOR 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC |
| | UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210 |
| | |