| Date |
Text |
| 2023-01-04 10:15:22 | PERMIT 22100341- REVISED PLUMBING PLANS DENIED. |
| | 1/4/2023 |
| | |
| | FAILED COMMENTS FROM THE 1ST REVIEW ARE LISTED BELOW |
| | WITH ADDITIONAL NOTES FOR FURTHER CLARIFICATION. |
| | |
| | |
| | 3) 2ND REQUEST. P-5.2.6: PROVIDE AN RPZ BACKFLOW |
| | PREVENTER FOR THE WATER LINE TO THE SPA EQUIPMENT- SEC. |
| | 608.17.4.1 FBC P AND SECS. C, D, & E- WPB CROSS |
| | CONNECTION MANUAL. PLEASE PROVIDE EQUIPMENT SCHEDULES |
| | FOR BOTH THE SPA AND POOL BF PREVENTERS- SEC. 608.3 FBC |
| | P. |
| | |
| | 4) 2ND REQUEST. SUBMIT REVISED SHEETS P-5.2.4 & P-6.2.1 |
| | SHOWING THE DRAINAGE TO BE DECHLORINATED AND DISCHARGED |
| | TO STORM, OR PLACE A NOTE ON SHEET P-2.2.1 FOR |
| | CLARIFCATION. |
| | P-2.2.1: DETAIL P-6 FOR POOL AND SPA BACKWASH DRAINAGE |
| | IS REFERENCED ON THE PLAN. THE DETAIL IS 11/P-6.2.1 |
| | WHICH WAS NOT PROVIDED BUT REVIEW OF THE MAIN PLUMBING |
| | PLANS SHOWS THE POOL BACKWASH DRAINING INTO THE |
| | SANITARY SYSTEM WHICH IS PROHIBITED PER SEC. 90-126 (5) |
| | WPB. |
| | |
| | 6) 2ND REQUEST. THE RESPONSE NARRATIVE INDICATES THE |
| | BRIDGE ROOF DRAINAGE ON NEW SHEET P-2.1.4 WHICH WAS NOT |
| | UPLOADED FOR REVIEW. |
| | SHEETS P-2.2.3, P-2.2.5 & P-5.2.5: PLEASE PROVIDE A |
| | DIMENSIONED BRIDGE ROOF DRAINAGE PLAN THAT SHOWS THE |
| | LOCATIONS OF THE PRIMARY AND SECONDARY (OVERFLOW) ROOF |
| | DRAINS, RAINFALL RATE, AND GPM FLOW AT THE RD LOCATION- |
| | SEC. 1105.1 & 1106.1 FBC P. THE RESPONSE NARRATIVE |
| | INDICATES A THE ROOF DRAINAGE ON NEW SHEET P-2.1.4 |
| | WHICH WAS NOT UPLOADED FOR REVIEW. |
| | |
| | 7) 2ND REQUEST. MINIMUM REQUIRED APPLICATIONS FOR THE |
| | POTABLE WATER BACKFLOW PREVENTER AND GREASE INTERCEPTOR |
| | NOT PROVIDED. PLEASE NOTE THAT SEPARATE PERMITS ARE |
| | REQUIRED FOR THE POTABLE WATER BACKFLOW PREVENTER, |
| | GREASE INTERCEPTOR, IRRIGATION, IRRIGATION BACKFLOW, |
| | AND POOL. IF REQUESTED GAS CAN ALSO BE UNDER A SEPARATE |
| | PERMIT. DUE TO A CHANGE IN PROCESS, THE BACKFLOW AND |
| | GREASE INTERCEPTOR PERMITS ARE REQUIRED TO BE SUBMITTED |
| | PRIOR TO APPROVAL OF THE PLUMBING REVISION. YOU CAN |
| | SUBMIT AN APPLICATION TBD (TO BE DETERMINED) IF YOU DO |
| | NOT HAVE A CONTRACTOR SELECTED BY EMAILING A COMPLETED |
| | PERMIT APPLICATION TO [email protected] . YOU |
| | WILL RECEIVE INSTRUCTIONS TO PAY FEES AND UPLOAD PLANS. |
| | YOU MAY UPLOAD PLANS AND PAY FEES AT A FUTURE DATE, BUT |
| | THE APPLICATION IS REQUIRED AT THIS TIME. WE RECOMMEND |
| | THAT YOU PAY FEES AND UPLOAD PLANS AT THE SAME TIME. |
| | AFTER YOU HAVE THE PERMIT(S) GENERATED, NOTIFY ME VIA |
| | EMAIL AND I WILL CHANGE THE REVIEW STATUS TO PASS. |
| | |
| | NEW COMMENTS BASED ON RESUBMITTED PLANS AND EMAIL |
| | CORRESPONDENCE WITH THE ENGINEER. |
| | |
| | 1) SHEETS A-1.2.1, P-2.2.1, P-5.2.4: MISSING FROM THE |
| | NEW PLUMBING FIXTURE CALCULATIONS AND APPARENTLY FROM |
| | THE PLAN IS THE REQUIRED SERVICE SINK. THE CALCULATIONS |
| | DO OMIT VITAL INFORMATION INCLUDING THE OCCUPANCY |
| | CLASSIFICATIONS AND OCCUPANT LOADS FOR EACH |
| | CLASSIFICATION, HOWEVER BASED ON THE PLANS AND TABLE |
| | 403.1 IT APPEARS A COMPLIANT NUMBER OF WATER CLOSETS |
| | AND LAVATORIES HAVE BEEN PROVIDED FOR THE POOL, AND THE |
| | A AND B OCCUPANCIES. IT IS ACKNOWLEDGED THAT FUTURE |
| | BATHROOMS WILL UNDER THE RETAIL BUILD-OUT PERMIT. |
| | |
| | 2) P-2.2.1 & P-5.2.4: 2ND REQUEST TO REVISE THESE |
| | SHEETS TO SHOW POOL WASTEWATER DISCHARGE DECHLORINATED |
| | AND DRAINED INTO THE STORM SYSTEM. |
| | |
| | 3) P-5.2.4: RISER #14 SHOWN IN THE ISO IS NOT SHOWN ON |
| | RISER SHEETS P-5.2.2 OR P-5.2.3- SEC. 107.2.1 WPB. |
| | |
| | 4) P-2.2.1 & P-5.2.4: THE 8-INCH MAIN BUILDING DRAIN |
| | LINE SHOWING 1622 DFU'S IS UNDERSIZED PER TABLE |
| | 710.1(1) AT 1/8-INCH PER FT. SLOPE. |
| | |
| | 5) P-5.2.6: THE EQUIPMENT SCHEDULES FOR THE STORAGE AND |
| | TANKLESS WATER HEATERS SHOWN ON THE ISO ARE NOT SHOWN |
| | ON SHEET P-6.2.2 AND NO INSTALLATION DETAILS PROVIDED |
| | SUCH AS THE DETAIL PROVIDED FOR THE APARTMENT UNITS ON |
| | P-6.2.1. THE DETAIL SHOULD SHOW THE MASTER THERMOSTATIC |
| | MIXING VALVE AND THE MEANS OF CONTROLLING EXPANSION- |
| | SECS. 607.1.1 & 607.3. |
| | |
| | 6) P-5.2.6: NO INFO OR DETAILS PROVIDED FOR REQUIRED |
| | TEMPERED WATER DELIVERY AT LAVS, MASTER THERMOSTATIC |
| | MIXING VALVES AT WATER HEATERS TO LIMIT HOT WATER |
| | TEMPERATURE DELIVERY, AND NO HW PIPE INSULATION SPECS- |
| | SECS. 419.5, 607.1.1, 606.2.1, AND TABLE C403.2.10. |
| | |
| | 7) P-5.2.6: THE LENGTHS OF HW FIXTURE SUPPLY PIPES TO |
| | THE LAVS IN GANG BATHROOM ARE EXCEEDING THE MAX 2FT. |
| | ALLOWABLE LENGTHS- TABLE C404.5.1. |
| | |
| | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE |
| | LETTER ADDRESSING EACH ITEM. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL/PLUMBING PLANS EXAMINER |
| | 401 CLEMATIS ST. |
| | WEST PALM BEACH, FL. 33401 |
| | 561-805-6719 |
| | [email protected] |
| | |
| | |