| 2022-11-15 16:57:44 | SFR ADDITION |
| | REVIEWED BY ROGER MCPHERSON |
| | 561-805-6716 |
| | [email protected] |
| | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| | AMENDMENT |
| | |
| | CORRECTIONS NEEDED - |
| | |
| | 1) PLEASE SHOW THE LOCATION AND THE DETAILS FOR THE |
| | DRAFT STOP FOR THE 2ND FLOOR TRUSSES - FBC R 302.12 |
| | |
| | 2) PLEASE SHOW THE GARAGE CEILING DETAILS TO COMPLY |
| | WITH FBC TABLE R302.6 |
| | |
| | 3) PLEASE SHOW GUARD RAIL DETAILS PER FBC R312.1 |
| | |
| | 4) PLEASE SHOW STAIR HAND RAIL DETAILS PER FBC R311.7.8 |
| | |
| | 5) PLEASE SHOW STAIR DETAILS - RISER HEIGHT, TREAD |
| | DEPTH, STAIR WIDTH ETC. - FBC R311.7 |
| | |
| | 6) PLEASE PROVIDE A COPY OF THE PRODUCT APPROVAL FOR |
| | THE FRONT DOOR AS LISTED ON THE DRAWINGS - FL27606.1 |
| | |
| | 7) PLEASE PROVIDE COMPLETE THE PRODUCT APPROVALS FOR |
| | THE ROOFING SYSTEMS. |
| | |
| | 8) PLEASE PROVIDE THE ELEVATOR DETAILS - FBC R321.1 |
| | |
| | 9) THE SITE PLAN NEEDS TO SHOW STORM WATER DRAINAGE FBC |
| | WPB107.2.5 SITE PLAN. THE CONSTRUCTION DOCUMENTS |
| | SUBMITTED WITH THE APPLICATION FOR PERMIT SHALL BE |
| | ACCOMPANIED BY A SITE PLAN SHOWING TO SCALE THE SIZE |
| | AND LOCATION OF NEW CONSTRUCTION AND EXISTING |
| | STRUCTURES ON THE SITE, DISTANCES FROM LOT LINES, THE |
| | ESTABLISHED STREET GRADES AND THE PROPOSED FINISHED |
| | GRADES, DEPICTING THE PROPOSED LOT DRAINAGE AND, AS |
| | APPLICABLE, FLOOD HAZARD AREAS, FLOODWAYS, AND DESIGN |
| | FLOOD ELEVATIONS; AND IT SHALL BE DRAWN IN ACCORDANCE |
| | WITH AN ACCURATE AND INCLUDED ON A BOUNDARY LINE |
| | SURVEY. (PLEASE PROVIDE CUT SECTIONS FOR ANY PROPOSED |
| | WATER RETAINING SWALES) |
| | |
| | 10) A SEPARATE PERMIT IS REQUIRED FOR - SITE WALL, |
| | FENCE, POOL |
| | |
| | 11) ITEMS SUCH AS BUT NOT LIMITED TO ROOFING PRODUCT |
| | APPROVALS, ELEVATOR DETAILS - MAY BE DEFERRED |
| | SUBMITTALS BY LISTING ITEMS TO BE DEFERRED ON THE |
| | CONSTRUCTION DOCUMENTS - 107.3.4.1 DEFERRED SUBMITTALS. |
| | FOR THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS |
| | ARE DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE |
| | NOT SUBMITTED AT THE TIME OF THE APPLICATION AND THAT |
| | ARE TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A |
| | SPECIFIED PERIOD. |