| 2023-03-16 14:15:48 | ALTERATION |
| | REVIEWED BY ROGER MCPHERSON |
| | 561-805-6716 |
| | [email protected] |
| | CODE USED FOR REVIEW - 2020 FBC WITH WPB CHAPTER 1 |
| | AMENDMENT |
| | |
| | CORRECTIONS NEEDED - |
| | |
| | 1) THE PRODUCT APPROVALS PROVIDED DO NOT HAVE THE SAME |
| | PRODUCT APPROVAL NUMBERS AS SHOWN ON DRAWING A3 |
| | "FENESTRATION SCHEDULE" PLEASE UP DATE THE PRODUCT |
| | APPROVALS NUMBERS ON THE "FENESTRATION SCHEDULE" |
| | |
| | 2) A PRODUCT APPROVAL FOR SLIDING GLASS DOORS HAS BEEN |
| | PROVIDED - PLEASE SHOW THE LOCATION OF THE SLIDING |
| | GLASS DOORS ON THE DRAWING. |
| | |
| | 3) PLEASE SHOW THE ACCESSIBLE ROUTE FROM THE ACCESSIBLE |
| | PARKING SPACE TO THE ENTRY - FBC 206.2.1 |
| | |
| | 4) PLEASE PROVIDE A SURVEY - EXTERIOR SWINGING DOORS |
| | CANNOT ENCROACH INTO THE RIGHT-OF-WAY - FBC 3202.2 |
| | |
| | 5) JOB COST SHOWN ON THE PERMIT APPLICATION APPEARS TO |
| | BE LOW - PLEASE PROVIDE A COST BREAK DOWN ( ALL |
| | MATERIALS AND LABOR NEEDS TO BE INCLUDED IN THE JOB |
| | COST) - FBC WPB 109.3 |
| | |
| | 6) SIGNED AND SEALED DRAWINGS C-1, S-1, A-1, BOTH A-3, |
| | (YES - THERE A 2 SEPARATE A-3 DRAWINGS) E1.1, E2.1, |
| | E4.1, FA1.1, E0.1, FA0.1 AND THE RESPONSE LETTER FROM |
| | DANIEL J. MOSS P.E. WHICH INCLUDES ACCESSIBILITY |
| | DETAILS - DO NOT SHOW IN ADOBE READER AS DIGITALLY |
| | SIGNED - SIGNED AND SEALED DRAWINGS IN PROJECTDOX NEED |
| | TO BE DIGITALLY/ELECTRONICALLY SIGNED TO BE USED IN |
| | ELECTRONIC PLAN REVIEW. (A CERTIFICATE-BASED DIGITAL |
| | SIGNATURE (OFTEN JUST CALLED A DIGITAL SIGNATURE) IS A |
| | SPECIFIC TYPE OF E-SIGNATURE). |