| Date |
Text |
| 2022-09-30 10:11:49 | JONATHAN BROOKS JR. |
| | BUILDING PLANS EXAMINER |
| | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM |
| | PHONE (561) 805-6656 |
| | EMAIL: [email protected] |
| | |
| | 1ST REVIEW: FBC 2020 7TH EDITION |
| | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) |
| | FBC B = FBC BUILDING |
| | FBC R = FBC RESIDENTIAL |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC EC = FBC ENERGY CONSERVATION |
| | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC |
| | RESULTS: DENIED |
| | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| | TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT |
| | CITY HALL, OR UPLOAD CORRECTIONS TO PROJECTDOX. |
| | |
| | 1. FBC R 908.2 PROVIDE CERTIFICATION THAT THE EXISTING |
| | STRUCTURAL ROOF COMPONENTS CAN SUPPORT THE NEW CONCRETE |
| | ROOFING TILE SYSTEM TO BE USED. |
| | 2. FBC R 301 FAC9N-3 SUBMITTED MIAMI-DADE COUNTY NOA |
| | 21-1217.02 SELECT INSTALLATION PROCEDURE SYSTEM TYPE |
| | E(1), E(2) OR E(3) IT DO NOT ALLOW FOR DIRECT-TO-DECK |
| | INSTALLATION. THE CITY OF WEST PALM BEACH WILL NOT |
| | ACCEPT DIRECT-TO-DECK METHOD OF INSTALLATION FOR THIS |
| | NOA. |
| | 3. FBC R 301 FAC9N-3. PROVIDE A COMPLETE SET OF 2020 |
| | CODE VERSION PRODUCT APPROVALS/NOA'S FOR THE PROPOSED |
| | HIP & RIDGE METAL TO BE USED. (FL5374-R6) |
| | 4. FBC B 107.2.1 PROVIDE A ROOF DRAINAGE PLAN THAT |
| | COMPLIES WITH SECTION 903.4 OF THE 2020 FBC-RESIDENTIAL |
| | AND CHAPTER 11 OF THE 2020 FBC-PLUMBING |
| | 5. FBC B 107.2.1 FOR CLARITY PLEASE PROVIDE A ROOF |
| | DIAGRAM/SKETCH WITH THE AREAS TO RECEIVE NEW ROOFING |
| | CLEARLY IDENTIFIED ON DRAWING; INCLUDE ROOF SLOPE(S), |
| | MEAN ROOF HEIGHT(S). |
| | 6. FBC B 107.2.1 REVISE VALUATION ON PERMIT APPLICATION |
| | TO MATCH CONTRACT VALUATION. |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | |