| Date |
Text |
| 2022-09-19 11:14:01 | JONATHAN BROOKS JR. |
| | BUILDING PLANS EXAMINER |
| | WORK HOURS: MONDAY - FRIDAY 7:00 AM TO 3:00 PM |
| | PHONE (561) 805-6656 |
| | EMAIL: [email protected] |
| | |
| | 1ST REVIEW: FBC 2020 7TH EDITION |
| | FBC = FLORIDA BUILDING CODE, 7TH EDITION (2020) |
| | FBC B = FBC BUILDING |
| | FBC R = FBC RESIDENTIAL |
| | FBC EB = FBC EXISTING BUILDING |
| | FBC A = FBC ACCESSIBILITY |
| | FBC EC = FBC ENERGY CONSERVATION |
| | WPB A = CITY OF WEST PALM BEACH AMENMENTS TO THE FBC |
| | RESULTS: DENIED |
| | ADDRESS THE ATTACHED COMMENTS AND RE-SUBMIT |
| | TO RESUBMIT, YOU CAN EITHER DROP OFF YOUR SUBMITTAL AT |
| | CITY HALL, OR UPLOAD CORRECTIONS TO PROJECTDOX. |
| | |
| | 1. PROVIDE A COMPLETE SET OF 2020 CODE VERSION PRODUCT |
| | APPROVALS/NOA'S FOR THE PROPOSED ROOFING TILE SYSTEM TO |
| | BE USED. INCLUDE COVER PAGE, EVALUATION REPORTS AND |
| | INSTALLATION INSTRUCTIONS FOR SYSTEM USED. ALL |
| | APPLICABLE DETAILS AND ATTACHMENTS MUST BE CLEARLY |
| | IDENTIFIED ON THE PRODUCT APPROVAL DRAWINGS. DETAILS |
| | AND ATTACHMENTS NOT SPECIFICALLY COVERED IN PRODUCT |
| | APPROVALS WILL NEED SITE-SPECIFIC ENGINEERING |
| | 2.FBC R 301 FAC9N-3. PROVIDE A COMPLETE SET OF 2020 |
| | CODE VERSION PRODUCT APPROVALS/NOA'S FOR THE PROPOSED |
| | HIP & RIDGE METAL TO BE USED. (FL5374-R6) |
| | 3. FBC R 301 FAC9N-3. PROVIDE A COMPLETE SET OF 2020 |
| | CODE VERSION PRODUCT APPROVALS/NOA'S FOR THE PROPOSED |
| | HIP & RIDGE TILE ADHESIVE TO BE USED. |
| | 4. FBC B 107.2.1. SUBMITTED MIAMI-DADE COUNTY NOA NO. |
| | 17-1003.15 SYSTEM TYPE A (1) MAXIMUM DESIGN PRESSURE |
| | -45 PSF. DO NOT MEET THE MINIMUM ZONE 3 DESIGN PRESSURE |
| | REQUIREMENT OF -108.17 FOR EXPOSURE CATEGORY C AREAS. |
| | GENERAL LIMITATION #9 IS SPECIFICALLY REFERRED TO IN |
| | THIS NOA. THE MAXIMUM DESIGNED PRESSURE LIMITATION |
| | LISTED SHALL BE APPLICABLE TO ALL ROOF PRESSURE ZONES |
| | (I.E. FIELD, PERIMETERS, AND CORNERS). NEITHER RATIONAL |
| | ANALYSIS, NOR EXTRAPOLATION SHALL BE PERMITTED FOR |
| | ENHANCED FASTENING AT ENHANCED PRESSURE ZONES (I.E. |
| | PERIMETERS, EXTENDED CORNERS AND CORNERS). THIS SYSTEM |
| | CAN???T BE USED. PROVIDE SYSTEM THAT MEETS OR EXCEEDS |
| | THESE REQUIREMENTS. |
| | 5. FBC B 107.2.1 1 PROVIDE THE FOLLOWING ADDITIONAL |
| | INFORMATION: AERIAL MAP OF THE ENTIRE COMPLEX WITH EACH |
| | BUILDING CLEARLY IDENTIFIED BY NUMBER; EACH PERMIT |
| | APPLICATION SHOULD ALSO REFLECT THE BUILDING NUMBER TO |
| | BE REROOFED. |
| | 6. INSPECTION WAIVERS/ROOFING AFFIDAVITS ARE NOT A PART |
| | OF PLAN REVIEW. ALL INSPECTION MATTERS MUST BE ADDRESS |
| | BY YOUR BUILDING INSPECTOR. |
| | 7. FBC EB 706.8. SHOW THAT THE VALUE OF THE STRUCTURE |
| | IS LESS THAN $300,000.00 OR SPECIFY HOW THE ROOF TO |
| | WALL CONNECTIONS WILL BE IMPROVED. |
| | |
| | PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED |
| | MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS. |
| | |