Plan Review Notes
Plan Review Notes For Permit 22080208
Permit Number 22080208
Review Stop B
Sequence Number 3
Notes
Date Text
2022-10-06 10:59:5910/06/22 RECEIVED EMAIL FROM ELIZABETH TUKE (OWNER) TO
 APPROVE BUILDING WITH PROVISO. JG.
  
 BUILDING REVIEW APPROVED WITH PROVISO.
 (NOTE: PROVIDE INFORMATION FOR REVIEW PRIOR TO
 INSTALLATION TO AVOID CONFLICTS/DELAYS):
 1- LAUNDRY ROOM ADDITION: PROVIDE COMPLETE ROOF FRAMING
 PLAN. SPECIFY ALL STRUCTURAL FRAMING MEMBERS AND
 CONNECTORS.
 NOTE: THERE ARE NO CITY RECORDS/PERMITS FOR CARPORT
 ADDITION AT THIS AREA. PLANS SHOW THIS CARPORT TOO
 CLOSE TO THE PROPERTY LINE. NEED ZONING AND BUILDING
 APPROVAL. CARPORT WILL NEED TO COMPLY WITH ZONING
 SETBACKS AND BUILDING FIRE RESISTANCE CONSTRUCTION
 REQUIREMENTS OF TABLE R302.1 FBC-RESIDENTIAL. IN
 ADDITON, NEED TO SHOW HOW RAIN WATER IS DIVERTED SO IT
 DOESN'T FALL INTO NEIGHBOR'S PROPERTY. BE AWARE.
 CARPORT MAY NEED TO BE REMOVED.
 2- CRAWL SPACE: NEED ACCESS. SHOW SIZE & LOCATION.
 3- PROVIDE COMPLETE DETAILS/SPECS FOR THE CONSTRUCTION
 OF THE BOXED COLUMNS SUPPORTING THE BALCONY GUARDRAIL.
 SPECIFY ALL FRAMING MEMBERS & CONNECTORS.
 4- ROOF INSULATION: SPECIFY INSULATION TYPE SHOWING
 COMPLIANCE WITH THE UNVENTED ATTIC SEC. R806.5
 FBC-RESIDENTIAL.
 NOTE: IF SPRAY FOAM INSULATION, THEN PROVIDE ICC
 EVALUATION REPORT. ARCHITECT TO APPROVE REPORT PRIOR TO
 SUBMITTAL.
 5- ROOF SHEATHING: REVISE NAILING SPACING TO COMPLY
 WITH TABLE R803.2.3.1 FBC-RESIDENTIAL FOR ALL ROOF
 ZONES.
 6- PROVIDE PRODUCT APPROVAL FOR:
 A)INSWING ENTRY DOOR AS SHOWN ON PLANS.
 B)SINGLE HUNG WINDOWS.
 C)HURRICANE SHUTTERS IF DOORS AND WINDOWS DON'T HAVE
 IMPACT GLAZING. AND, PROVIDE COMPLETE INSTALLATION
 SCHEDULE. SEE CITY SAMPLE.
 D) NEW LOUVERED SHUTTERS AS SPECIFIED ON PLANS. AND,
 PROVIDE COMPLETE INSTALLATION SCHEDULE. SEE CITY
 SAMPLE.
 E)AIR HANDLER UNIT EXTERIOR DOOR AS SHOWN ON PLANS.
 F)WINDOW MULLIONS (NOTE: NEED TO SPECIFY MULLION SIZE
 TO VERIFY PRESSURES. SEC. R301.2.1 FBC-RESIDENTIAL).
 G)HARDIE BOARD SIDING AS SPECIFIED ON PLANS.
 H)ROOF SHINGLES.
 I)ROOFING UNDERLAYMENT SPECIFIED ON PLANS.
 J) BALCONY UNDERLAYMENT SPECIFIED ON PLANS FOR PROPOSED
 FINISH FLOOR.
 7- DESIGNER OF RECORD TO APPROVE ALL PRODUCT APPROVALS.
 8- REPLACEMENT OF WINDOWS. WINDOW FALL PROTECTION SHALL
 BE PROVIDED ON 2ND FLOOR WINDOWS WHERE WINDOW SILL IS
 LESS THAN 24" ABOVE THE FINISHED FLOOR . SEC. R312.2
 FBC RESIDENTIAL.
 NOTE: CLEARLY INDICATE THE WINDOW SILL HEIGHT OF SECOND
 FLOOR WINDOWS AND SPECIFY TYPE OF WINDOW FALL
 PROTECTION IF REQUIRED.
  


Account Summary | Usage Policy | Privacy Policy